期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
宽进路接续盘区耦合开采技术研究
1
作者 包东程 陈自辉 +1 位作者 孙旭民 张伟龙 《矿业工程》 CAS 2013年第5期28-30,共3页
为提高三山岛金矿采场回采效率,缩短采场回采的时间,经过研究矿山采用宽进路交替式盘区耦合开采技术,一步进路回采后接顶充填,二步进路回采后预留切割槽,为接续盘区的回采提供了空间。该技术满足了扩产要求,具有推广应用价值。
关键词 宽进路接续盘区 耦合开采 回采效率
下载PDF
Numerical simulation on fault water-inrush based on fluid-solid coupling theory 被引量:3
2
作者 HUANG Han-fu MAO Xian-biao +1 位作者 YAO Bang-hua PU Hai 《Journal of Coal Science & Engineering(China)》 2012年第3期291-296,共6页
About 75% water-inrush accidents in China are caused by geological structure such as faults, therefore, it is necessary to investigate the water-inrush mechanism of faults to provide references for the mining activity... About 75% water-inrush accidents in China are caused by geological structure such as faults, therefore, it is necessary to investigate the water-inrush mechanism of faults to provide references for the mining activity above confined water. In this paper, based on the fluid-solid coupling theory, we built the stress-seepage coupling model for rock, then we combined with an example of water-inrush caused by fault, studied the water-inrush mechanism by using the numerical software COMSOL Mutiphysics, analyzed the change rule of shear stress, vertical stress, plastic area and water pressure for stope with a fault, and estimated the water-inrush risk at the different distances between working faces and the fault. The numerical simula- tion results indicate that: (1) the water-inrush risk will grow as the decrease of the distance between working face and the fault; (2) the failure mode of the rock in floor with fault is shear failure; (3) the rock between water-containing fault and working face failure is the reason for water-inrush. 展开更多
关键词 FAULT fluid-solid coupling water inrush numerical simulation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部