The study was conducted to identify indoor air quality and the level of thermal comfort in various selected locations in Faculty of Engineering and Built Environment (FKAB), University Kebangsaan Malaysia (UKM) wi...The study was conducted to identify indoor air quality and the level of thermal comfort in various selected locations in Faculty of Engineering and Built Environment (FKAB), University Kebangsaan Malaysia (UKM) with built-up area of 250,936 fie. The indoor air quality and thermal comfort were measured at various selected locations by using indoor air quality equipment (Thermal Comfort SERI). The thermal comfort assessments are based on Malaysian Code of Practice Indoor Air Quality 2005 and Moderate Thermal Environments-Determination of the PMV and PPD indices specification of the condition for thermal comfort (ISO7730:1994) From the data analysis, the FKAB building is considered inadequately vented space. The concentration of CO2 for all sampling area evaluated exceeds the recommended concentration (〉 1000 ppm). The ventilation system used in FKAB building is designed by delivering fix amount of fresh air into building from external building without consideration on the number of occupants. This common ventilation design will increase the amount of CO2 dramatically all day long and these reflect the inefficiency of energy used. The faculty needs to be equipped with a comprehensive energy management system that can allow detailed documentation of continuous performance of all energy system and consumption in the building.展开更多
文摘The study was conducted to identify indoor air quality and the level of thermal comfort in various selected locations in Faculty of Engineering and Built Environment (FKAB), University Kebangsaan Malaysia (UKM) with built-up area of 250,936 fie. The indoor air quality and thermal comfort were measured at various selected locations by using indoor air quality equipment (Thermal Comfort SERI). The thermal comfort assessments are based on Malaysian Code of Practice Indoor Air Quality 2005 and Moderate Thermal Environments-Determination of the PMV and PPD indices specification of the condition for thermal comfort (ISO7730:1994) From the data analysis, the FKAB building is considered inadequately vented space. The concentration of CO2 for all sampling area evaluated exceeds the recommended concentration (〉 1000 ppm). The ventilation system used in FKAB building is designed by delivering fix amount of fresh air into building from external building without consideration on the number of occupants. This common ventilation design will increase the amount of CO2 dramatically all day long and these reflect the inefficiency of energy used. The faculty needs to be equipped with a comprehensive energy management system that can allow detailed documentation of continuous performance of all energy system and consumption in the building.