On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The hea...On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The heavy ruined area was up to 30,000km2 and 13% of its land surface was denuded by the extremely terrible quakes. The mountain collapses, landslides and debris flows induced by the earthquake not only scared the landscape at the immense scale, but also poured L66-billion-m3 sediment combined with offscourings and rubble into the Yangtze River and its breaches. This amount of sediments is 3 times more than the normal amount discharged into the Yangtze River, and will significantly increase sediment transportation of rivers and decrease storage capacities of reservoirs downstream. The dramatic increase in sediment load will imperil the engineering safety and impact the operation of the giant Three-Gorge Hydro-power Station if no proper prevention measures are taken.展开更多
The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing ...The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing investment in the early period of power grid construction, however, too small capacity load ratio will make the power grid have poor adaptability, affecting the power supply. Reasonably determining the adopted regional power grid capacity load ratio quantitative numerical value in planning has a strong guiding significance for constructing reliable and economic power grid and preventing power grid from excessive advance or lagging behind the load development. This paper, through the statistics and analysis of a certain regional power grid 2010-2012 three years' power grid daily load characteristics and the investment benefit evaluation of three years' 220KV power grid individual project, makes a preliminary analysis and puts forwards the specific advice on the reasonable values of power ~rid 35-220KV power transformation capacity load ratio.展开更多
基金carried out under the auspices of the public project of the Ministry of Water Conservancy of China (200801073, 2007SHZ0901034)the Knowledge Innovation Project of the Chinese Academy of Science (KZCX1-YW-08)
文摘On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The heavy ruined area was up to 30,000km2 and 13% of its land surface was denuded by the extremely terrible quakes. The mountain collapses, landslides and debris flows induced by the earthquake not only scared the landscape at the immense scale, but also poured L66-billion-m3 sediment combined with offscourings and rubble into the Yangtze River and its breaches. This amount of sediments is 3 times more than the normal amount discharged into the Yangtze River, and will significantly increase sediment transportation of rivers and decrease storage capacities of reservoirs downstream. The dramatic increase in sediment load will imperil the engineering safety and impact the operation of the giant Three-Gorge Hydro-power Station if no proper prevention measures are taken.
文摘The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing investment in the early period of power grid construction, however, too small capacity load ratio will make the power grid have poor adaptability, affecting the power supply. Reasonably determining the adopted regional power grid capacity load ratio quantitative numerical value in planning has a strong guiding significance for constructing reliable and economic power grid and preventing power grid from excessive advance or lagging behind the load development. This paper, through the statistics and analysis of a certain regional power grid 2010-2012 three years' power grid daily load characteristics and the investment benefit evaluation of three years' 220KV power grid individual project, makes a preliminary analysis and puts forwards the specific advice on the reasonable values of power ~rid 35-220KV power transformation capacity load ratio.