Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requir...Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.展开更多
Shearer and hydraulic support are matching equipments. To increase the operating speed of the shearer, the following speed of hydraulic support must be increased. This means increasing the volume of flow from emulsion...Shearer and hydraulic support are matching equipments. To increase the operating speed of the shearer, the following speed of hydraulic support must be increased. This means increasing the volume of flow from emulsion power station. Analyzing the operating characteristics of hydraulic supports, the number of simultaneously operating supports is obtained by means of pressure parameter and time history at a certain time, which is a theory base for development of control system to multi-pump emulsion power station.展开更多
In this paper, we study the convergence rate of two-dimensional Baakakov operators with Jacobi-weights and the approximation equivalence theorem is obtained, making use of multivariate decompose skills and results of ...In this paper, we study the convergence rate of two-dimensional Baakakov operators with Jacobi-weights and the approximation equivalence theorem is obtained, making use of multivariate decompose skills and results of one-dimensional Baskakov operators.展开更多
Multi-factor productivity(MFP) in underground coal mining has been on the decline for the last decade.The mining industry requires a viable and sustainable approach to overcome the current downtrend. This is only poss...Multi-factor productivity(MFP) in underground coal mining has been on the decline for the last decade.The mining industry requires a viable and sustainable approach to overcome the current downtrend. This is only possible by concurrently focussing on productivity improvement and operating costs reduction,delivered through both incremental and step change technology development. Four technologies are presented in this paper: fibre optic borehole sensing has been demonstrated to reveal detailed information about gas flow influx, water level and borehole blockage events occurring along the length of a surfaceto-inseam lateral. Fibre optic gas sensing has also been investigated, and this technology promises a remote, intrinsically safe, distributed solution. Recent developments in continuous water jet drilling technology have demonstrated a step change increase in drilling rates and flexibility for coal seam degassing,applicable in both surface-to-inseam and underground in-seam applications. The application of water jet technology to the cable bolt drilling problem offers potential to address a serious health and safety and productivity issue in the roadway development process.展开更多
文摘Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.
文摘Shearer and hydraulic support are matching equipments. To increase the operating speed of the shearer, the following speed of hydraulic support must be increased. This means increasing the volume of flow from emulsion power station. Analyzing the operating characteristics of hydraulic supports, the number of simultaneously operating supports is obtained by means of pressure parameter and time history at a certain time, which is a theory base for development of control system to multi-pump emulsion power station.
基金Supported by the Scientific Research Fund of Zhejiang Province Education Depart-ment(200700190) Supported by the Science Technique Planed Item of Taizhou City(063KY08)Supported by Major Scientific Research Fund of Taizhou University(09ZD08)
文摘In this paper, we study the convergence rate of two-dimensional Baakakov operators with Jacobi-weights and the approximation equivalence theorem is obtained, making use of multivariate decompose skills and results of one-dimensional Baskakov operators.
基金Australian Coal Association Research Program (ACARP)CRCMining’s Coal Technologies and Fugitive Emissions Research programThe University of Queensland
文摘Multi-factor productivity(MFP) in underground coal mining has been on the decline for the last decade.The mining industry requires a viable and sustainable approach to overcome the current downtrend. This is only possible by concurrently focussing on productivity improvement and operating costs reduction,delivered through both incremental and step change technology development. Four technologies are presented in this paper: fibre optic borehole sensing has been demonstrated to reveal detailed information about gas flow influx, water level and borehole blockage events occurring along the length of a surfaceto-inseam lateral. Fibre optic gas sensing has also been investigated, and this technology promises a remote, intrinsically safe, distributed solution. Recent developments in continuous water jet drilling technology have demonstrated a step change increase in drilling rates and flexibility for coal seam degassing,applicable in both surface-to-inseam and underground in-seam applications. The application of water jet technology to the cable bolt drilling problem offers potential to address a serious health and safety and productivity issue in the roadway development process.