期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
馆藏古籍《增订四书补注备旨》刻本考
1
作者 张舰戈 《图书馆学刊》 2022年第3期95-100,共6页
清代科举用书《增订四书补注备旨》在流传过程中形成了大量版本。从乾隆中期到民国时期,全国大部分书坊都曾出版此书。现在多家图书馆都藏有此书,其版本之多在我国古代出版史上留下了辉煌的篇章。
关键词 清代刻本 古籍馆藏 《四书旨》 辽宁省图书馆
下载PDF
秦继宗《书经汇解》对《书集传》之驳正——兼论《书集传》在晚明之影响
2
作者 林相 《安康学院学报》 2019年第4期56-62,共7页
秦继宗《书经汇解》博取《书经大全》“小注”与晚明时人解《书》之说,围绕蔡沈《书集传》以发论。《书经汇解》虽承认《书集传》在明代之一尊地位,但认为其传文反有使经文不明之处,故广择众说以辨其讹误、补其未备。通过《书经汇解》... 秦继宗《书经汇解》博取《书经大全》“小注”与晚明时人解《书》之说,围绕蔡沈《书集传》以发论。《书经汇解》虽承认《书集传》在明代之一尊地位,但认为其传文反有使经文不明之处,故广择众说以辨其讹误、补其未备。通过《书经汇解》对《书集传》之驳正,我们不仅能对《书集传》之谬失窥之一隅,而且对《书集传》在晚明之地位及影响也可略得管见。 展开更多
关键词 《书经汇解》 《书集传》 驳正 补备 影响
下载PDF
Load compensation research on twicetension for loop anchor cable of inner lining in Yellow River-crossing tunnel 被引量:3
3
作者 Yin Juan Cao Shengrong +1 位作者 Qin Gan Yang Fan 《Engineering Sciences》 EI 2014年第1期77-86,共10页
The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loo... The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loop anchorage prestressing loss(PL) values of inner lining(IL)in Yellow River-crossing tunnel under two anchorage systems,including twice- tension anchorage system and HM(Chinese transliteration is huanmao)anchorage system,are introduced. The software ANSYS is selected to realize the three-dimensional(3D) finite element modeling to accomplish simulation and calculation works under the two anchorage systems,respectively. Stress processes of IL under the two working conditions,of which one is completed cable tensioning(CCT) and the other is water in the tunnel with the designed water pressure(DWP),are contrasted and analyzed. Impacts of prestressing forces of anchor cables on structural safety under the two anchorage systems are contrasted. The calculation results show that the twice-tension anchorage system can reduce PL effectively and then increase prestresses of wall concrete(WC). Meanwhile,the anchorage system has the advantages of improving security and stability of tunnel structure,reducing project costs and saving steel consumption. The research work is available to related design and construction of anchor cable,and is worthy of promotion and application. 展开更多
关键词 loop anchorage prestressing loss twice-tension load compensation nonlinear finite element Yellow River-crossing tunnel
下载PDF
吉林省图书馆(1956—1988)历任馆长简历
4
《图书馆学研究》 1988年第5期79-82,共4页
关键词 吉林省图书馆 馆长 简历 毒热 拉碳 日班 物价 声门 相州
下载PDF
大别山抒怀
5
作者 丁正元 朱援朝 《广播歌选》 2010年第4期47-47,共1页
关键词 大别山 自由 元朝 林木 鱼子 重流 改革 通里 光辉
下载PDF
Parameter Test and Analysis for Dynamic Compensation Devices in Wind Power Farms
6
作者 Bai Runqing Qin Rui Zhi Yong Zhou Xichao Yang Yong 《Electricity》 2012年第4期20-24,共5页
The dynamic reactive power compensation equipment in Jiuquan Wind Power Base of above 10 GW consists of three different types of compensation devices, including: static var generator (SVG), thyristor controlled com... The dynamic reactive power compensation equipment in Jiuquan Wind Power Base of above 10 GW consists of three different types of compensation devices, including: static var generator (SVG), thyristor controlled compensator (TGR) and magnetically controlled reactor (MGR). The lack of experimental verification of performance is not conducive to voltage/var management or full utilization of device capaci- ties. In order to solve the above problems, the compensation device performance test was performed. The test items and procedures were selected based on related national standards with the consideration for different grid structures and wind farm operation modes. The testing contents included dynamic regulating range, active power loss, dynamic response time, and harmonic voltage level. Three types of compensation devices installed in different wind farms, namely SVG, TCR and MCR, were chosen and tested. The performances were compared and analyzed according to the field test results. 展开更多
关键词 wind power farm reactive power compensation parameter test
下载PDF
THE EFFECT OF PRE-TASK PLANNING TIME ON SELF-REPAIRS FOR INTERMEDIATE AND ADVANCED ENGLISH LEARNERS 被引量:1
7
作者 顾韵 《Chinese Journal of Applied Linguistics》 2007年第6期25-33,127,共10页
This paper studies the effect of different lengths of pre-task planning time on the frequency and accuracy of self-repairs for Chinese intermediate and advanced English learners.The findings reveal that the increased ... This paper studies the effect of different lengths of pre-task planning time on the frequency and accuracy of self-repairs for Chinese intermediate and advanced English learners.The findings reveal that the increased pre-task planning time strongly improves fluency and accuracy of self-repairs for both lexical and syntactic errors in the advanced group,but enhanced fluency and accuracy are not witnessed in the intermediate group as planning time increases.The differences are mainly due to the fact that some intermediate learners are not well equipped with the appropriate way of preparation for oral presentation tasks since some write down their ideas in Chinese.Thus errors will increasingly emerge in the transfer.Besides,they usually give priority to accuracy while neglecting fluency. 展开更多
关键词 SELF-REPAIR pre-task planning time language proficiency
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部