期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
某型引信装定机构工艺性分析
1
作者 周家胜 李艳飞 关帅 《兵器试验》 2014年第6期45-46,共2页
为解决某型引信装定机构研制中的工艺性设计问题,从装定杆传火孔与引信传火孔同轴度以及装定杆旋转不自由这两个方面的问题入手,分析了问题出现的因素,并通过改变公差尺寸达到了预期状态。
关键词 引信 装定机构 工艺性 公差尺寸
原文传递
Design and Fabrication of Hybrid Piezomotor Applied in Precision Positioning Devices 被引量:2
2
作者 CHENG Dong-ming DUAN Zhi-yong MA Feng-ying GONG Qiao-xia 《Semiconductor Photonics and Technology》 CAS 2007年第1期25-32,共8页
The motor’s configuration is designed and the dynamic analysis equations based on its simplified model are deduced. A testing system utilizing grating is set up to test this new motor, and the theoretical movement pr... The motor’s configuration is designed and the dynamic analysis equations based on its simplified model are deduced. A testing system utilizing grating is set up to test this new motor, and the theoretical movement principle for the motor is proved by experiments. The pulse waveforms are applied to drive the motor to move in steps. The motor has a displacement resolution of 10 nm and a maximum velocity of 0.6 mm/s. It can drive a 200 g slider whose range is 20 mm. A one-dimensional precision positioning platform is fabricated by using the new hybrid piezoelectric motor. The prototype is made up of two servomotors and two piezoelectric motors, which are controlled automatically by a computer. The positioning range of the platform is 10 cm. 展开更多
关键词 hybrid piezoelectric motors precision positioning devices micro-machining systems dynamic analysis
下载PDF
Energy saving analysis of segment positioning in shield tunneling machine considering assembling path optimization 被引量:4
3
作者 施虎 龚国芳 +1 位作者 杨华勇 梅雪松 《Journal of Central South University》 SCIE EI CAS 2014年第12期4526-4536,共11页
A motion parameter optimization method based on the objective of minimizing the total energy consumption in segment positioning was proposed for segment erector of shield tunneling machine. The segment positioning pro... A motion parameter optimization method based on the objective of minimizing the total energy consumption in segment positioning was proposed for segment erector of shield tunneling machine. The segment positioning process was decomposed into rotation, lifting and sliding actions in deriving the energy calculation model of segment erection. The work of gravity was taken into account in the mathematical modeling of energy consumed by each actuator. In order to investigate the relationship between the work done by the actuator and the path moved along by the segment, the upward and downward directions as well as the operating quadrant of the segment erector were defined. Piecewise nonlinear function of energy was presented, of which the result is determined by closely coupled components as working parameters and some intermediate variables. Finally, the effectiveness of the optimization method was proved by conducting a case study with a segment erector for the tunnel with a diameter of 3 m and drawing comparisons between different assembling paths. The results show that the energy required by assembling a ring of segments along the optimized moving path can be reduced up to 5%. The method proposed in this work definitely provides an effective energy saving solution for shield tunneling machine. 展开更多
关键词 energy saving segment erector work of gravity path optimization shield tunneling machine
下载PDF
再说军用望远镜
4
作者 柯尼 《轻兵器》 2001年第5期24-26,共3页
本刊2000年第4期曾刊出作者《话说军用望远镜》一文,2000年第10期“读者信箱”中,又对军用望远镜的密位测量作了补充说明。现作者对历史上我军缴获和引进的军用望远镜,及军、民用望远镜的区别等项再作一补缀。
关键词 望远镜 抗美援朝战争 装定机构 中国抗日战争 解放战争 侵华日军 突击步枪 光学玻璃 轻武器 50年代
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部