The tilting-train is very attractive to the railroad users in the world due to the advantage of high speed in curved track using pre-existing infrastructure of railway.Tilting-train has a unique allowable speed and me...The tilting-train is very attractive to the railroad users in the world due to the advantage of high speed in curved track using pre-existing infrastructure of railway.Tilting-train has a unique allowable speed and mechanism especially in curved track.In this work,when tilting-train is operated with the allowable speed,the behavior of roadbed is evaluated by examining its settlement and bearing capacity.Additionally,the stability of roadbed is estimated as the roadbed is in the condition of soft soil influenced by the weather effects and cyclic train loading.Numerical results show that the roadbed settlement satisfies the allowable settlement when the elastic moduli of upper roadbed and in-situ soil are greater than 3800 and 4600 kN/m2 for rail joint and 2300 and 3300 kN/m2 for continuous welded rail(CWR).展开更多
基金supported by the 2014 Inje University research grant
文摘The tilting-train is very attractive to the railroad users in the world due to the advantage of high speed in curved track using pre-existing infrastructure of railway.Tilting-train has a unique allowable speed and mechanism especially in curved track.In this work,when tilting-train is operated with the allowable speed,the behavior of roadbed is evaluated by examining its settlement and bearing capacity.Additionally,the stability of roadbed is estimated as the roadbed is in the condition of soft soil influenced by the weather effects and cyclic train loading.Numerical results show that the roadbed settlement satisfies the allowable settlement when the elastic moduli of upper roadbed and in-situ soil are greater than 3800 and 4600 kN/m2 for rail joint and 2300 and 3300 kN/m2 for continuous welded rail(CWR).