期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
改造尿素装置解析水解系统 实现清洁生产
1
作者 周玲 宋胜利 王黎萍 《化工安全与环境》 2005年第48期21-22,共2页
乌鲁木齐石化公司化肥厂二尿素装置自投产以来,废水处理装置解析水解系统运行一直不正常,通过提高汽提动力、解决液位指标不正常的难题、将填料塔改为筛板塔等一系列技术改造,使运行变为正常,实现了清洁生产。
关键词 尿素装置 解析水解系统 技术改造 清洁生产
下载PDF
An Analytic Solution to Well-water Level Changes under Barometric Pressure
2
作者 Liu Chunping Deng Liang +2 位作者 Liao Xin Wan Fei Shi Yun 《Earthquake Research in China》 2011年第2期240-249,共10页
Under barometric pressure, groundwater flow in well-aquifer systems is a kind of hydromechanical coupling problem. Applying the flux boundary conditions on borehole wall and water pressure equilibrium conditions insid... Under barometric pressure, groundwater flow in well-aquifer systems is a kind of hydromechanical coupling problem. Applying the flux boundary conditions on borehole wall and water pressure equilibrium conditions inside and outside the borehole wall under barometric pressure (BP), an analytic solution to well-water level changes has been proposed in this paper. The formulation shows that the BP coefficients increase with time and tend to BP constant. The Change of BP coefficients over time depends only on the ratio of transmissivity (T) to the well radius squared ( r2, ) , and has nothing to do with the change in BP. The BP constant only relates to aquifer loading efficiency (B), and has nothing to do with the aquifer transmissivity and well radius. The BP coefficients' change over time in the analytic formulation is consistent with the analysis of measured data from the Nanxi wells. Based on the BP coefficient changes over time, a parameter estimation method is suggested and discussed in its application to the estimation of the aquifer BP constant (or B) and transmissivity by using the Nanxi well data. 展开更多
关键词 Well-water level Barometric pressure Analytic solution PARAMETERESTIMATION Barometric pressure coefficient
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部