In this paper, the generative approach utilizes recursion to generate process sequence for a part, and then match detail procedure design and select process equipment. A set of recursive formulas are found. Finally ...In this paper, the generative approach utilizes recursion to generate process sequence for a part, and then match detail procedure design and select process equipment. A set of recursive formulas are found. Finally a complete process program is produced. The method is simple than that of the knowledge system, the artificial neural networks and variant approach computer aided process planning(VACAPP).展开更多
The amount of material must be removed away to produce the final product should minimize, excess stock will increase not only the material cost, but also processing cost, fixture cost, tooling cost, and increases mach...The amount of material must be removed away to produce the final product should minimize, excess stock will increase not only the material cost, but also processing cost, fixture cost, tooling cost, and increases machine cycle times. Noticing in recent years that the world is running out of mineral resources, and the price of engineering materials will continually rise in the future, the percentage of the cost of manufactured part that is due to the cost of materials is also rising. This paper proposed a variant CAPP system for rotational parts based on the concept of group technology, this system accepts part features characteristics code number as an input and provides operation details for manufacturing route with the suitable primary processes required to produce the blank work piece as an output.展开更多
文摘In this paper, the generative approach utilizes recursion to generate process sequence for a part, and then match detail procedure design and select process equipment. A set of recursive formulas are found. Finally a complete process program is produced. The method is simple than that of the knowledge system, the artificial neural networks and variant approach computer aided process planning(VACAPP).
文摘The amount of material must be removed away to produce the final product should minimize, excess stock will increase not only the material cost, but also processing cost, fixture cost, tooling cost, and increases machine cycle times. Noticing in recent years that the world is running out of mineral resources, and the price of engineering materials will continually rise in the future, the percentage of the cost of manufactured part that is due to the cost of materials is also rising. This paper proposed a variant CAPP system for rotational parts based on the concept of group technology, this system accepts part features characteristics code number as an input and provides operation details for manufacturing route with the suitable primary processes required to produce the blank work piece as an output.