期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
湖北省机关事业单位养老保险管理系统设计与实现 被引量:1
1
作者 陈年生 许新山 +3 位作者 董武世 李志 汪汉良 张珍宝 《湖北师范学院学报(自然科学版)》 2002年第3期35-38,共4页
从设计原则、系统结构、系统功能等方面介绍了湖北省机关事业单位养老保险管理系统 。
关键词 湖北 机关事业单位 养老保险管理系统 系统设计 系统结构 系统功能 设计原测
下载PDF
A comparative assessment of rock mass deformation modulus 被引量:3
2
作者 Kadir Karaman Ferdi Cihangir Ayhan Kesimal 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第5期735-740,共6页
Deformation modulus of a rock mass(E_m) is one of the most important design parameters in construction of rock engineering projects such as underground excavations.However,difficulties are frequently encountered durin... Deformation modulus of a rock mass(E_m) is one of the most important design parameters in construction of rock engineering projects such as underground excavations.However,difficulties are frequently encountered during in-situ tests which are also time-consuming and expensive for determining this parameter.Although E_m is often estimated indirectly from proposed equations by different researchers,many of these equations cannot be used in case of problematic rock conditions(thinly bedded,highly jointed rock masses,etc.) as high quality core samples are required.This study aims to explore more practical and useful equation for E_m estimation using Rock Quality Designation(RQD) and point load index values.Comparisons were made between available empirical equations and the proposed E_m equation in terms of the estimation capacity.Multiple comparison tests(ANOVA) showed that E_m can be reliably estimated using proposed equation especially at the preliminary stages of projects. 展开更多
关键词 Rock mass deformation modulus RQD RMR Q RMI Point load index
下载PDF
Tracer Testing Strategies for Effective Design and Implementation of in Situ Groundwater Remediation
3
作者 Anil Waduge Elizabeth Cohen Craig Divine 《Journal of Environmental Science and Engineering(A)》 2013年第12期759-769,共11页
The effectiveness of an injection-based remediation strategy is primarily governed by accurate understanding of reagent delivery and ensuring uniform distribution within the reactive zone. In IRZ (in situ reactive z... The effectiveness of an injection-based remediation strategy is primarily governed by accurate understanding of reagent delivery and ensuring uniform distribution within the reactive zone. In IRZ (in situ reactive zone) design, the required reagent strength, injection volumes, injection rates, injection frequency, injection and monitoring well spacing, and the cost and time to achieve remediation goals are governed by the hydrogeology of the site. A properly designed tracer test is capable of providing critical above mentioned site-specific information, to assist with full scale design of an IRZ. This paper describes that implementing tracer testing to support remedial design can result in enhanced design efficiency, added assurance in full-scale implementation and ultimately resulted in substantial cost savings. Therefore, it is recommended that the broader practitioner community adopt this technique as a best practice for effective and optimum in situ remediation system design. 展开更多
关键词 Tracer testing mobile porosity in situ remediation system design.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部