本文介绍一种基于层次分析法的 MIS 设备选型与配置的方法.这一方法以淘汰选择、配置方案设计、方案寻优三个序贯步骤组成.方法的基点是面向具体的管理信息系统项目考虑系统适合性,把定性和定量二类指标纳入一个层次结构评价模型来既保...本文介绍一种基于层次分析法的 MIS 设备选型与配置的方法.这一方法以淘汰选择、配置方案设计、方案寻优三个序贯步骤组成.方法的基点是面向具体的管理信息系统项目考虑系统适合性,把定性和定量二类指标纳入一个层次结构评价模型来既保证定性分析的科学性和定量分析的精确性,又保证二类指标综合评价的统一性.方法的目的是要提供一种系统的分析方法以利于进行 MIS设备选型与配置的工作.实践表明,这一方法有助于克服传统上凭经验和直觉,以及一般计算机性能评价方法只注意计算机横向间比较等方面所带来的问题和缺点.同时,这一方法不但有其科学的内涵,也具有易学易用的特点.展开更多
Drill machines used in surface mines, particularly in coal, is characterized by a very poor utilization (around 40%) and low availability (around 60%). The main purpose of this study is to develop a drill selec- t...Drill machines used in surface mines, particularly in coal, is characterized by a very poor utilization (around 40%) and low availability (around 60%). The main purpose of this study is to develop a drill selec- tion methodology and simultaneously a performance evaluation technique based on drill cuttings produced and drilling rate achieved. In all 28 blast drilled through were investigated. The drilling was accomplished by 5 different drill machines of Ingersoll-Rand and Revathi working in coal mines of Sonepur Bazari (SECL) and Block-II (BCCL). The drills are Rotary and Rotary Percussive type using tri- cone rock roller bits. Drill cuttings were collected and sieve analysis was done in the laboratory. Using Rosin Ramler Diagram, coarseness index (CI), mean chip size (d), specific-st trace area (SSA) and charac- teristic particle size distribution curves for all the holes drilled were plotted. The predictor equation for drill penetration rate established through multiple regressions was found to have a very good correlation with an index of determination of 0.85. A comparative analysis of particle size distribution curves was used to evaluate the drill efficiency. The suggested approach utilises the area under the curve, after the point of trend reversal and brittleness ratio of the respective bench to arrive at drill energy utilization index (DEUI), for mapping of drill machine to bench, The developed DEU1 can aid in selecting or mapping a right machine to right bench for achieving higher penetration rate and utilizations.展开更多
Aiming at the decision-making problem of construction programme choice,this paper advanced a new group expandable optimization decision-making model.Various factors were comprehensively considered,and the new multi-at...Aiming at the decision-making problem of construction programme choice,this paper advanced a new group expandable optimization decision-making model.Various factors were comprehensively considered,and the new multi-attribute evaluation index system was established.Based on the assumption that decision-makers were rational,this paper formed a group of rational preferences through extracting the personal preferences pertinently,so the decision-makers position matrix was determined.The decision-makers position matrix integrated values given by group decision-makers to construction programme comprised a matrix,of which the entropy theory for datamining was adopted in this paper to determine the attribute weights.A decision was made by using the extension decision method.Eventually,the feasibility and practicability of the model were verified by the example.展开更多
文摘本文介绍一种基于层次分析法的 MIS 设备选型与配置的方法.这一方法以淘汰选择、配置方案设计、方案寻优三个序贯步骤组成.方法的基点是面向具体的管理信息系统项目考虑系统适合性,把定性和定量二类指标纳入一个层次结构评价模型来既保证定性分析的科学性和定量分析的精确性,又保证二类指标综合评价的统一性.方法的目的是要提供一种系统的分析方法以利于进行 MIS设备选型与配置的工作.实践表明,这一方法有助于克服传统上凭经验和直觉,以及一般计算机性能评价方法只注意计算机横向间比较等方面所带来的问题和缺点.同时,这一方法不但有其科学的内涵,也具有易学易用的特点.
文摘Drill machines used in surface mines, particularly in coal, is characterized by a very poor utilization (around 40%) and low availability (around 60%). The main purpose of this study is to develop a drill selec- tion methodology and simultaneously a performance evaluation technique based on drill cuttings produced and drilling rate achieved. In all 28 blast drilled through were investigated. The drilling was accomplished by 5 different drill machines of Ingersoll-Rand and Revathi working in coal mines of Sonepur Bazari (SECL) and Block-II (BCCL). The drills are Rotary and Rotary Percussive type using tri- cone rock roller bits. Drill cuttings were collected and sieve analysis was done in the laboratory. Using Rosin Ramler Diagram, coarseness index (CI), mean chip size (d), specific-st trace area (SSA) and charac- teristic particle size distribution curves for all the holes drilled were plotted. The predictor equation for drill penetration rate established through multiple regressions was found to have a very good correlation with an index of determination of 0.85. A comparative analysis of particle size distribution curves was used to evaluate the drill efficiency. The suggested approach utilises the area under the curve, after the point of trend reversal and brittleness ratio of the respective bench to arrive at drill energy utilization index (DEUI), for mapping of drill machine to bench, The developed DEU1 can aid in selecting or mapping a right machine to right bench for achieving higher penetration rate and utilizations.
基金Project of Hunan Fund in Social Science (No.11YBB060)
文摘Aiming at the decision-making problem of construction programme choice,this paper advanced a new group expandable optimization decision-making model.Various factors were comprehensively considered,and the new multi-attribute evaluation index system was established.Based on the assumption that decision-makers were rational,this paper formed a group of rational preferences through extracting the personal preferences pertinently,so the decision-makers position matrix was determined.The decision-makers position matrix integrated values given by group decision-makers to construction programme comprised a matrix,of which the entropy theory for datamining was adopted in this paper to determine the attribute weights.A decision was made by using the extension decision method.Eventually,the feasibility and practicability of the model were verified by the example.