A sensor scheduling problem was considered for a class of hybrid systems named as the stochastic linear hybrid system (SLHS). An algorithm was proposed to select one (or a group of) sensor at each time from a set ...A sensor scheduling problem was considered for a class of hybrid systems named as the stochastic linear hybrid system (SLHS). An algorithm was proposed to select one (or a group of) sensor at each time from a set of sensors. Then, a hybrid estimation algorithm was designed to compute the estimates of the continuous and discrete states of the SLHS based on the observations from the selected sensors. As the sensor scheduling algorithm is designed such that the Bayesian decision risk is minimized, the true discrete state can be better identified. Moreover, the continuous state estimation performance of the proposed algorithm is better than that of hybrid estimation algorithms using only predetermined sensors. Finallyo the algorithms are validated through an illustrative target tracking example.展开更多
In order to coordinate automatic voltage control (AVC) systems of a large interconnected system, a multi-level multi-area hybrid automatic voltage control (MLMA-HAVC) system was constructed. This system began its ...In order to coordinate automatic voltage control (AVC) systems of a large interconnected system, a multi-level multi-area hybrid automatic voltage control (MLMA-HAVC) system was constructed. This system began its trial operation in the Northeast China Grid in January 2010, and for the first time in China and abroad it realized automatic close-loop control of multi-area and multi-level interconnected power grid and multi-objective self-approaching optimization in aspects of security, high quality and economic operation. This system has three breakthroughs in theory and engineering application: l) Established the MLMA-HAVC theory to solve multi-objective optimization of large-scale system; 2) proposed reactive power/voltage coordination control method to inhibit or further eliminate regional oscillations; 3) presented advanced state estimation algorithm to guarantee acquisition of high reliability data. This paper summarizes the basic principle of MLMA-HAVC, and reports engineering realization of MI ,MA-HAVC system in tha Northeast China Grid.展开更多
基金Foundation item: Project(2012AA051603) supported by the National High Technology Research and Development Program 863 Plan of China
文摘A sensor scheduling problem was considered for a class of hybrid systems named as the stochastic linear hybrid system (SLHS). An algorithm was proposed to select one (or a group of) sensor at each time from a set of sensors. Then, a hybrid estimation algorithm was designed to compute the estimates of the continuous and discrete states of the SLHS based on the observations from the selected sensors. As the sensor scheduling algorithm is designed such that the Bayesian decision risk is minimized, the true discrete state can be better identified. Moreover, the continuous state estimation performance of the proposed algorithm is better than that of hybrid estimation algorithms using only predetermined sensors. Finallyo the algorithms are validated through an illustrative target tracking example.
基金supported by the Science and Technology Project of Northeast China Grid Company(Grant No.2009ZB1048)the National Natural Science Foundation of China(Grant Nos.50907038,50977047)
文摘In order to coordinate automatic voltage control (AVC) systems of a large interconnected system, a multi-level multi-area hybrid automatic voltage control (MLMA-HAVC) system was constructed. This system began its trial operation in the Northeast China Grid in January 2010, and for the first time in China and abroad it realized automatic close-loop control of multi-area and multi-level interconnected power grid and multi-objective self-approaching optimization in aspects of security, high quality and economic operation. This system has three breakthroughs in theory and engineering application: l) Established the MLMA-HAVC theory to solve multi-objective optimization of large-scale system; 2) proposed reactive power/voltage coordination control method to inhibit or further eliminate regional oscillations; 3) presented advanced state estimation algorithm to guarantee acquisition of high reliability data. This paper summarizes the basic principle of MLMA-HAVC, and reports engineering realization of MI ,MA-HAVC system in tha Northeast China Grid.