期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Progress Report of New Rebuncher Project in HIRFL at IMP
1
作者 Zhou Xuehou, Nie Yuzhu, Lan Tao, Wang Yifang and Sun Liepeng 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2002年第1期142-142,共1页
The new rebuncher project was going well in last two years. Recently, the main RF parameters of the cavity were measured without power, the tuning driving control system and fine tuning system were adjusted and worked... The new rebuncher project was going well in last two years. Recently, the main RF parameters of the cavity were measured without power, the tuning driving control system and fine tuning system were adjusted and worked well, the full power test on the 50Ω dummy load on amplifier was finished and successful in the manufactory in Shanghai and Nanjing.All of the equipment of the new rebuncher (including RF resonator and tuning driving system, 40 kW amplifier and so on) were delivered and installed on the beam line in SSC hall in HIRFL at IMP last summer. 展开更多
关键词 HIRFL聚束器 调谐驱动控制系统 真空腔 水冷系统 输入阻抗 加速器设计
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部