In this paper,we propose a novel adjustable multiple cross-hexagonal search(AMCHS) algorithm for fast block motion estimation. It employs adjustable multiple cross search patterns(AMCSP) in the first step and then use...In this paper,we propose a novel adjustable multiple cross-hexagonal search(AMCHS) algorithm for fast block motion estimation. It employs adjustable multiple cross search patterns(AMCSP) in the first step and then uses half-way-skip and half-way-stop technique to determine whether to employ two hexagonal search patterns(HSPs) subsequently. The AMCSP can be used to find small motion vectors efficiently while the HSPs can be used to find large ones accurately to ensure prediction quality. Simulation results showed that our proposed AMCHS achieves faster search speed,and provides better distortion performance than other popular fast search algorithms,such as CDS and CDHS.展开更多
Based on real-time digital simulations(RTDS),a laboratory environment similar to the real-time operation situation of the Three Gorges Hydropower Station is established.Then,the causes for the power fluctuation of the...Based on real-time digital simulations(RTDS),a laboratory environment similar to the real-time operation situation of the Three Gorges Hydropower Station is established.Then,the causes for the power fluctuation of the second generator by errors in the rotor rotating speed calculation are found,and the tuning method of the speed related parameters are given.The damping and reverse tuning characteristics of power system stabilizers(PSSs)in the digital automatic voltage regulator(AVR)are compared and investigated in the frequency range of 0.18-1.1 Hz.The efficiency of the proposed tuning method for ensuring power system stability is verified by RTDS.Finally,field tests show the validity of the laboratory test results.展开更多
Scheduling chain combination is the core of chain-based scheduling algorithms, the speed of which determines the overall performance of corresponding scheduling algorithm. However, backtracking is used in general comb...Scheduling chain combination is the core of chain-based scheduling algorithms, the speed of which determines the overall performance of corresponding scheduling algorithm. However, backtracking is used in general combination algorithms to traverse the whole search space which may introduce redundant operations, so performance of the combination algorithm is generally poor. A fast scheduling chain combination algorithm which avoids redundant operations by skipping “incompatible” steps of scheduling chains and using a stack to remember the scheduling state is presented in this paper to overcome the problem. Experimental results showed that it can improve the performance of scheduling algorithms by up to 15 times. By further omitting unnecessary operations, a fast algorithm of minimum combination length prediction is developed, which can improve the speed by up to 10 times.展开更多
文摘In this paper,we propose a novel adjustable multiple cross-hexagonal search(AMCHS) algorithm for fast block motion estimation. It employs adjustable multiple cross search patterns(AMCSP) in the first step and then uses half-way-skip and half-way-stop technique to determine whether to employ two hexagonal search patterns(HSPs) subsequently. The AMCSP can be used to find small motion vectors efficiently while the HSPs can be used to find large ones accurately to ensure prediction quality. Simulation results showed that our proposed AMCHS achieves faster search speed,and provides better distortion performance than other popular fast search algorithms,such as CDS and CDHS.
文摘Based on real-time digital simulations(RTDS),a laboratory environment similar to the real-time operation situation of the Three Gorges Hydropower Station is established.Then,the causes for the power fluctuation of the second generator by errors in the rotor rotating speed calculation are found,and the tuning method of the speed related parameters are given.The damping and reverse tuning characteristics of power system stabilizers(PSSs)in the digital automatic voltage regulator(AVR)are compared and investigated in the frequency range of 0.18-1.1 Hz.The efficiency of the proposed tuning method for ensuring power system stability is verified by RTDS.Finally,field tests show the validity of the laboratory test results.
基金Project (No. Y105355) supported by the Natural Science Foundationof Zhejiang Province, China
文摘Scheduling chain combination is the core of chain-based scheduling algorithms, the speed of which determines the overall performance of corresponding scheduling algorithm. However, backtracking is used in general combination algorithms to traverse the whole search space which may introduce redundant operations, so performance of the combination algorithm is generally poor. A fast scheduling chain combination algorithm which avoids redundant operations by skipping “incompatible” steps of scheduling chains and using a stack to remember the scheduling state is presented in this paper to overcome the problem. Experimental results showed that it can improve the performance of scheduling algorithms by up to 15 times. By further omitting unnecessary operations, a fast algorithm of minimum combination length prediction is developed, which can improve the speed by up to 10 times.