期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
农业税种设置要合理
1
《江苏农村经济》 北大核心 2003年第5期45-45,共1页
关键词 农业税 税种设置 财产积 资源税 营业税 增值税 所得税
下载PDF
Experience of Planning the Local Climate Change Adaptation Plan in Taoyuan
2
作者 Hung-Pin Huang Tih-Ju Chu 《Journal of Civil Engineering and Architecture》 2016年第3期309-315,共7页
Based on the experience of emergency operation on earthquake and flooding in local and foreign countries, the secondary disasters of fire, damage of critical infrastructure usually harmed lives or disturbed living con... Based on the experience of emergency operation on earthquake and flooding in local and foreign countries, the secondary disasters of fire, damage of critical infrastructure usually harmed lives or disturbed living condition. In order to safeguard people's lives and property safety, Taoyuan City Government, except for elementary public facilities, added standardized disaster prevention parks and detention ponds in the zone-expropriation project at Chunglu area. The zone-expropriation project at Chunglu, Taoyuan is designed for 487,600 residents in 2021. The area of public facilities of park, school, road and green land is 50.7 ha, 41.88% of total development area of 122.06 ha, in which, the capacity of disaster prevention parks at Chunglu area is designed for 3,164 refugee in 7.54 ha. An underground storage construction, withstand 7-magnitude earthquake, could supply the amount of water consumption of 3 L daily per person, lasting at least four weeks. The capacity of two detention ponds is 87,800 m3. During normal times, the disaster prevention park and detention ponds can be used as a recreational space for residents. When a disaster occurs, shelters are set up in the parks to accommodate residents to protect lives and property. And, detention ponds could adjust outflow discharge into neighborhood drainage system to mitigate disaster happening. Because the construction of standardized disaster prevention park with climate change needs much more land area, the acquisition of private land area is very difficult either general acquisition or zone expropriation in urban area. During each stage of zone expropriation, the support of landlord and Mayor Wu is very important. By means of public participation, information meeting was held hundreds times and revised content according to landlord's positive opinion. Moreover, the design idea and content was discussed with consultant-company mutually from time to time. Fortunately, this project is finished successfully and got award from Public Construction Council of Taiwan in 2014. 展开更多
关键词 Taoyuan Chunglu detention pond disaster prevention park climate change
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部