In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u...In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.展开更多
China’s national oil and gas companies saw their profits slump during the first six months of 2015,with the levels falling to the lowest in five years,according to financial reports.The first-half reports for China’...China’s national oil and gas companies saw their profits slump during the first six months of 2015,with the levels falling to the lowest in five years,according to financial reports.The first-half reports for China’s"big three" oil companies - China National Petroleum (CNPC), China Petrochenlical Corporation, as Sinopec. and China National Offshore Oil Corporation also known Corporation (CNOOC) - showed that CNPC's profit tell by more than 60 percent to 25.4 billion yuan (US$3.98 billion), Sinopec by 22 percent to 25.4 billion yuan, and CNOOC by more than 50 percent to 14.7 billion yuan.展开更多
文摘In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.
文摘China’s national oil and gas companies saw their profits slump during the first six months of 2015,with the levels falling to the lowest in five years,according to financial reports.The first-half reports for China’s"big three" oil companies - China National Petroleum (CNPC), China Petrochenlical Corporation, as Sinopec. and China National Offshore Oil Corporation also known Corporation (CNOOC) - showed that CNPC's profit tell by more than 60 percent to 25.4 billion yuan (US$3.98 billion), Sinopec by 22 percent to 25.4 billion yuan, and CNOOC by more than 50 percent to 14.7 billion yuan.