浅谈如何搞好煤矿安全管理工作 被引量:1
1
作者 周奇 刘裕晓 《科技风》 2013年第13期249-249,共1页
文章通过煤矿安全管理中抓双基、抓隐患、抓管理、抓培训、群防群治、利益驱动、责任追究、落实"五个到位"的论述对新形势下搞好煤矿安全工作的注意事项进行了探讨。
关键词 双基 隐患 质标管理 管理培训 齐抓共管 重奖重罚 责任追究 五到位
下载PDF
BENEFITS OF ISO 9000 CERTIFICATION AND FURTHER DEVELOPMENT ON QUALITY MANAGEMENT 被引量:1
2
作者 李达义 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 1998年第1期97-102,共6页
This paper summarizes the benefits of ISO 9000 certification based on the findings of nine research studies conducted in more than ten developed countries/cities. Major benefits derived by the certified companies are ... This paper summarizes the benefits of ISO 9000 certification based on the findings of nine research studies conducted in more than ten developed countries/cities. Major benefits derived by the certified companies are identified. Future development approaches adopted by certified companies are summarized. Aspects of research methodology and objective for future research in ISO 9000 are also discussed. 展开更多
关键词 quality management BENEFITS ISO9000 DEVELOPMENT
下载PDF
Ultimate end bearing capacity of rock-socketed pile based on generalized nonlinear unified strength criterion 被引量:7
3
作者 章敏 王星华 汪优 《Journal of Central South University》 SCIE EI CAS 2011年第1期208-215,共8页
In order to study the mechanism of bearing behavior at the tip of a pile embedded in rock, the generalized nonlinear unified strength criterion and slip line principle for resolving the differential equation systems w... In order to study the mechanism of bearing behavior at the tip of a pile embedded in rock, the generalized nonlinear unified strength criterion and slip line principle for resolving the differential equation systems which govern the stress field were applied to derive the ultimate end beating capacity based on some reasonable hypothesis and failure plane model. Both numerical simulation and test results were compared with the theoretic solution. The results show good consistency with each other and verify the validity of the present approach. The depth effect with respective to embedment ratio and other influence factors like geological strength index, intermediate principal stress, overburden factor, and damage on end bearing capacity were discussed in the analytical solution. The results show that the proposed yield criterion can be much better for investigating the ultimate end bearing performance of rock-socketed pile. The end bearing capacity increases with embedment ratio and the increasing degree is influenced intensely by the above parameters. Furthermore, ignoring intermediate stress effect would underestimate the strength properties of the rock material and lead to a very conservative estimation value. 展开更多
关键词 rock-socketed pile generalized nonlinear unified strength criterion slip line principle embedment ratio damage endbearing capacity
下载PDF
APPLICATION OF ISO 9000 QUALITY MANAGEMENT SYSTEMS FOR SMALL SIZED COMPANIES
4
作者 Lo J S K Quality & Reliability Centre Advisory Committee,The Hong Kong Polytechnic University Hung Hom, Kowloon, Hong Kong 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 1998年第1期116-120,共5页
The common mystique is that ISO 9000 quality management systems are only applicable to large companies, and such systems are too expensive for smaller companies. This paper clarifies this misconception. It shows th... The common mystique is that ISO 9000 quality management systems are only applicable to large companies, and such systems are too expensive for smaller companies. This paper clarifies this misconception. It shows that the inherent ISO 9000 systems are in fact flexible that permit their application to small companies, regardless of the type of trade disciplines. In addition, it shows some of the pitfalls that certification assessors and quality management consultants should watch out for. 展开更多
关键词 quality management systems ISO 9000 DEVELOPMENT
下载PDF
Evaluation of Soil Quality Indicators in Sugarcane Management in Sandy Loam Soil 被引量:5
5
作者 S.A.C.SANT'ANNA M.F.FERNANDES +1 位作者 W.M.P.M.IVO J.L.S.COSTA 《Pedosphere》 SCIE CAS CSCD 2009年第3期312-322,共11页
An important factor for the sustainability of soils highly susceptible to degradation is the use of monitoring tools that promptly and realistically reflect changes imposed on soil by different cropping systems. To se... An important factor for the sustainability of soils highly susceptible to degradation is the use of monitoring tools that promptly and realistically reflect changes imposed on soil by different cropping systems. To select soil quality indicator variables in sugarcane (Saccharum officinarum L.) production areas that fulfill the criteria of sensitivity to management practices and between-season consistency in the management discrimination, ten composite soil samples (0–10 cm) were collected in July 2005 (rainy season) and again in March 2006 (dry season) from areas under cultivation of organic sugarcane (OS), green sugarcane (GS), burned sugarcane (BS) and from an adjacent native forest (NF) area at Usina Triunfo, Boca da Mata, Alagoas, Brazil. Microbial biomass-C (MBC), total organic C (TOC), soil enzyme activity expressed as the rate of fluorescein diacetate (FDA) hydrolysis, mean weight diameter of water-stable soil aggregates (MWD), and percentage of water-stable macroaggregates (PWSA) were analyzed. Although MBC and TOC were higher in NF than in the cultivated areas, no differences were observed in these C pools between the three sugarcane systems. The response of FDA to the site management was dependent on the sampling time. In the rainy period, the activity followed the order: NF > OS > GS > BS, whereas in the dry season, only NF differed from the other treatments. Irrespective of the sampling time, MWD and PWSA decreased in the order NF > OS = GS > BS. The variables MWD and PWSA are quite sensitive for discriminating between site management histories regardless the sampling season. 展开更多
关键词 fiuorescein diacetate green-sugarcane organic matter management sugarcane (Saccharum oJficinarum L.) sustainable agricultural use
下载PDF
Monitoring and Analysis of SPM of an Industrial Town of Punjab (India)
6
作者 K.M. Susheel G. Krunesh S. Nirankar 《Journal of Environmental Science and Engineering》 2010年第6期31-37,共7页
Suspended particulate matter (SPM) levels in ambient air were monitored at Mandi Gobindgarh, an industrial town of Punjab, India located on the National Highway-1 during November 2001 to March 2002 covering spring a... Suspended particulate matter (SPM) levels in ambient air were monitored at Mandi Gobindgarh, an industrial town of Punjab, India located on the National Highway-1 during November 2001 to March 2002 covering spring and winter seasons to check the variation of SPM and its constituents in the town. The maximum levels of SPM varied between 594 μg/m^3 to 620 μg/m^3 at selected monitoring sites while the minimum levels varied between 209μg/m^3 to 220 μg/m^3. These values were observed always above the National Ambient Air Quality Standards (NAAQS) set by the State regulatory body. Major sources of SPM were identified as the industrial activity and traffic plying on the national highway. Collected SPM samples were further analyzed for the ignitable matter as loss on ignition (LOI) and organic tarry matter (OTM) content. Ignitable component of the SPM constituted about 45% and tarry matter in the ambient air was about 12%. Effects of meteorological parameters like temperature, wind direction and wind speed on SPM levels are discussed. 展开更多
关键词 Ambient air SPM monitoring tarry and ignitable matter seasonal variation
下载PDF
Thinking substation construction project management methods
7
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control BIDDING civil engineering
下载PDF
Ranking Quality Management Indicators for Radio Programs
8
作者 Chia-Kun Lee 《Journalism and Mass Communication》 2016年第7期389-396,共8页
Even though radio broadcasting is one of the most widespread electronic mass media, its management for survival is getting drastic. The competition among incumbent radio stations becomes challenging due to the market ... Even though radio broadcasting is one of the most widespread electronic mass media, its management for survival is getting drastic. The competition among incumbent radio stations becomes challenging due to the market change and environmental evolution. Managing program quality is a critical issue to a radio station to sharpen its competitive advantages. Quality management of radio programs is intertwined with complicated factors. In order to identify the primary factors affecting radio program quality as well as explore the impact level these factors bring, this study adopts modified Delphi method and analytic hierarchy process (AHP) to explore the issues. According to the outcomes modified Delphi method, the factors were categorized into four dimensions: operation, coordination, structure, and improvement. Ten sub-dimensions were followed. Each sub-dimension includes six to nineteen indicators for measuring radio program quality. In total, 72 indicators were identified. The AHP result revealed that the most important weight was given to the operation dimension. On the contrary, the least important weight was placed on the improvement dimension. Among the sub-dimensions, the standard procedure and organizational design were rated more important than the rest. The results could provide some facts to radio managers for future management. 展开更多
关键词 quality RADIO INDICATORS DELPHI AHP
下载PDF
An Adaptive Management Strategy of CQI Channel Allocation in IEEE 802.16 Systems
9
作者 王立磊 陈斌 徐惠民 《Journal of Donghua University(English Edition)》 EI CAS 2009年第5期533-538,共6页
IEEE 802.16 systems adopt a "semi-dynamic" allocation mechanism of channel quality indicator (CQI) channels.However,low utilization ratio of CQI channels reduces the spectrum efficiency.So we propose an adap... IEEE 802.16 systems adopt a "semi-dynamic" allocation mechanism of channel quality indicator (CQI) channels.However,low utilization ratio of CQI channels reduces the spectrum efficiency.So we propose an adaptive management strategy of CQI channels based on an analysis model named "toy brick model" to improve the efficiency.The simulation results validate the improvement. 展开更多
关键词 channel quality indicator CQI channelallocation IEEE 802. 16 systems management strategytoy brick model
下载PDF
Studies of the management work on the college students in colleges and universities
10
作者 Gao Lina 《International English Education Research》 2015年第1期17-19,共3页
In the stage of education, the college management is the indispensable part in the college education and teaching, but the management of colleges and universities is clearly different from the management of the junior... In the stage of education, the college management is the indispensable part in the college education and teaching, but the management of colleges and universities is clearly different from the management of the junior and senior high schools, which is decided by the educational ages, and is also determined by the educational targets. In the management of the colleges and universities, how can we carry out the management of high quality? To solve this problem, the author of this paper will carry out the analysis and elaboration from the three levels of the comparison between the management work on the college students in China and America, the transformation factors that the management work on the university students in our country is facing, and the relevant recommendations on the management work on the college students, in order to improve the quality of the management on the colleges and universities, and promote the sound development of the higher education. 展开更多
关键词 Colleges and universities management on the college students TRANSFORMATION
下载PDF
A Prospective Study on the Establishment of International Standards for GRP-ICM and GQP-ICM
11
作者 荣培晶 李宗友 《Journal of Traditional Chinese Medicine》 SCIE CAS CSCD 2011年第1期64-68,共5页
Objective: In order to promote the construction of scientific research institutions of TCM in the world and to raise the vitality of the institutions, a prospective study has been done on the establishment of the inte... Objective: In order to promote the construction of scientific research institutions of TCM in the world and to raise the vitality of the institutions, a prospective study has been done on the establishment of the international standards for the research institutions and quality management, namely, Good Research Practice - Institution of Chinese Medicine (GRP-ICM) and Good Quality Practice - Institution of Chinese Medicine (GQP-ICM). Methods: The document analysis, questionnaire, and experts' consultation were adopted to solicit the opinions on the establishment ofinternational standards for the research institutions and quality management. A total of 74 experts from 22 countries and regions (including China) participated in the questionnaire survey, and 30 experts from 11 countries and regions received the consultations and interviews. Results: In the survey, 85.14% of the experts (63/74 experts)considered that it is necessary to establish the unified international standards; 90.00% appraised GRP-ICM excellent and 80.00% appraised GQP-ICM goods; and 93.10% thought that these two standards can be implemented or can be implemented after revision. Conclusion: This is a prospective study on the establishment ofinternational standards for the research institutions and quality management, with a preliminary understanding of the basic framework, main contents and formulating principles. It lays a solid foundation for the establishment and implementation of the unified international standards for the research institutions and quality management. 展开更多