Examining Construction Quality Supervision and Organization Procedures for BOT Projects by Comparing with DBB Projects
1
作者 Leu Wen Hao Andrew S. Chang 《Journal of Civil Engineering and Architecture》 2011年第5期412-420,共9页
Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT proje... Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT projects such as concessionaire selection criteria and risk factors. But the project execution becomes complicated such as the escalated quality supervision organization and procedure at the construction stage. This extra supervision may have constituted hidden redundancies as waste to economic sustainability. This paper investigated construction quality supervision of BOT projects to pinpoint adequate degree of supervision and detect redundant organization and procedures. The study adopted ten subway construction projects as cases in which five were from the traditional design-bid-build (DBB) and five from the BOT methods. Thirty six project participants including owners, contractors, designers, and concessionaire managers of the ten projects were interviewed to tell their views on these issues. The quality supervision measures of the DBB projects were used as the baseline and compared with those of the BOT projects. The research results show that the construction quality seems no difference for the DBB and BOT projects. Construction quality comes out of supervision but excessive supervision organization and procedures do not necessarily improve quality. This finding indicates that adequate degree of supervision is enough to achieve required quality to save immense paperwork for large construction projects. 展开更多
关键词 BOT DBB quality supervision quality organization and procedure subway construction.
下载PDF
Auditing in the 21 st Century: Has Self-regulation Failed?*
2
作者 Mahbubul Islam 《Journal of Modern Accounting and Auditing》 2013年第8期1059-1069,共11页
From the very beginning, auditing is pretty much a self-regulated follow in practice. But the plethora of recent corporate failures profession and has some ethical rules of thumb to and scandals where auditors' instr... From the very beginning, auditing is pretty much a self-regulated follow in practice. But the plethora of recent corporate failures profession and has some ethical rules of thumb to and scandals where auditors' instrumental role is evident in many instances raise question about the validity and suitability of "self-regulation" in auditing, especially in the 21st century where auditors need to perform auditing in ever complex risk management process. Moreover, to restore the market confidences within the auditing profession and to raise the overall audit quality, many countries are establishing some super regulatory bodies to oversee the functions of auditing and auditors. Based on the "documentary research methodology", the author examines whether "self-regulation" in auditing has completely failed in the 21 st century. The author reveals that "self-regulation" in auditing has not completely failed; rather, a joint approach is needed to raise the overall quality of auditing where there will be equilibrium between "self-regulation" and statutory directive. 展开更多
关键词 SELF-REGULATION audit failure audit expectation gap INDEPENDENCE the 21 st century audit
下载PDF
温州电厂三期工程
3
《浙江人大》 2006年第4期65-65,共1页
2005年7月14日,经过168个小时满负荷试运行,装机容量为30万千瓦的6号机组正式投入商业运行。历经24个月,温州电厂三期工程宣告全面建成,其5号机组比合同工期提前了87天,6号机组比合同工期提前了129天。至此,历经漫长的15年,规划总装机... 2005年7月14日,经过168个小时满负荷试运行,装机容量为30万千瓦的6号机组正式投入商业运行。历经24个月,温州电厂三期工程宣告全面建成,其5号机组比合同工期提前了87天,6号机组比合同工期提前了129天。至此,历经漫长的15年,规划总装机容量为147万千瓦的温州电厂的建设也画上圆满的句号。电,是温州工业发展的主要瓶颈之一,也是百姓生活的心头之“痛”。在温州用电形势依旧非常严峻的情况下,温州电厂三期的提前投产,犹如“及时雨”, 较大程度地缓解了电力供需矛盾。 展开更多
关键词 满负荷试运行 总装容量 电力供需矛盾 合同工期 国内电力 工业发展 发电企业 电力开发 质量监督机
原文传递
棉花加工资格认定和市场管理暂行办法
4
《司法业务文选》 2007年第4期38-48,共11页
关键词 棉花加工 暂行办法 市场管理 行政许可 发展改革部门 十六条 工商行政管理 行政执法 质量监督机