期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
编制一个有效的项目计划
1
作者 蔚林巍 《企业管理》 CSSCI 北大核心 2001年第10期13-17,共5页
关键词 项目计划 项目管理 项目估算 项目预算 工作时间安排 资源安排计划
下载PDF
A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems 被引量:1
2
作者 何曙光 齐二石 李钢 《Transactions of Tianjin University》 EI CAS 2003年第4期348-352,共5页
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio... The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given. 展开更多
关键词 resource constrained project scheduling problem multi-agent systems general equilibrium market ALGORITHM
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部