期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
坐底安装平台超压载与坐底稳性分析
1
作者 邱永吉 田宝涛 《船舶工程》 CSCD 北大核心 2024年第S01期119-122,188,共5页
目前国内坐底安装平台数量逐渐增多,在坐底时,时常出现过少的超压载量导致船舶稳性不足或过多的压载量导致入泥较深而影响起浮安全,为指导坐底作业的操作安全,结合船体的弹性理论和黏土的弹塑性理论,采用有限元方法,利用ABAQUS软件计算... 目前国内坐底安装平台数量逐渐增多,在坐底时,时常出现过少的超压载量导致船舶稳性不足或过多的压载量导致入泥较深而影响起浮安全,为指导坐底作业的操作安全,结合船体的弹性理论和黏土的弹塑性理论,采用有限元方法,利用ABAQUS软件计算坐底后增加不同超压载时的入泥深度,同时通过施加风浪流载荷,计算分析不同超压载所产生的底部摩擦阻力,以间接验证对平台坐底稳性和安全的影响,结果表明,超压载量与船底入泥深度和摩擦阻力均成正比,有利于平台稳性,但不利于起浮安全。通过本文的分析,将为坐底式安装平台的安全施工作业提供有价值的参考,以数值化代替经验化,同时在本文研究基础上,后续可进一步研究有关克服吸附力起浮、防倾覆等相关内容。 展开更多
关键词 坐底安装平台 超压载 坐底稳性
下载PDF
Secondary settlement estimation in surcharge preload subject to time effect of secondary consolidation coefficient 被引量:2
2
作者 胡亚元 杨平 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第2期341-352,共12页
In order to eliminate the settlement underestimation in surcharge preload engineering, a study based on Bjerrum's creep diagram and the tangent slope definition of secondary consolidation coefficient was carried o... In order to eliminate the settlement underestimation in surcharge preload engineering, a study based on Bjerrum's creep diagram and the tangent slope definition of secondary consolidation coefficient was carried out to analyze the time effect of secondary consolidation coefficient of over consolidated soil, and a time–growth model for it was formulated. As Bjerrum's creep diagram is an idealized model, oedometer tests were performed to improve the above time–growth model of secondary consolidation coefficient for the purpose of achieving a better agreement with the actual ground situations. It is found that secondary consolidation coefficient of over consolidated soil not only decreases with the ratio of historical maximum to current effective stress of soil(OCR), but also increases with the development time of secondary consolidation. No matter how large OCR is, the long-term time effect of secondary consolidation coefficient of over consolidated soil is all significant. Based on the above results, a model for settlement estimation was formulated and a case study to estimate it indicates that the settlement estimated by our method is 2–5 times larger than that estimated by the previous method. Moreover, the larger the OCR is as well as the longer the service life is, the larger the difference between our method and the previous method is. Thus, the post-construction secondary settlement in surcharge preload engineering will be underestimated when neglecting the time effect of secondary consolidation coefficient in over consolidated state. 展开更多
关键词 post-construction secondary settlement time effect tangent slope secondary consolidation coefficient
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部