The research conducted investigation and survey on 186 farm households in 2014 and carried out economic evaluation on "planting three to produce four" highyielding project of super hybrid rice. The results showed th...The research conducted investigation and survey on 186 farm households in 2014 and carried out economic evaluation on "planting three to produce four" highyielding project of super hybrid rice. The results showed that the project of "planting three to produce four" performed significantly in terms of increasing yields and incomes. For example, per unit area yield of one-season late hybrid rice and middleseason hybrid rice proved the highest, and net income from middle-season rice in Longhui was the highest. It is obvious that to increase per unit yield is key for improving net incomes and to reduce machine fees and worker fees is crucial for decreasing fees.展开更多
Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span...Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed.展开更多
文摘The research conducted investigation and survey on 186 farm households in 2014 and carried out economic evaluation on "planting three to produce four" highyielding project of super hybrid rice. The results showed that the project of "planting three to produce four" performed significantly in terms of increasing yields and incomes. For example, per unit area yield of one-season late hybrid rice and middleseason hybrid rice proved the highest, and net income from middle-season rice in Longhui was the highest. It is obvious that to increase per unit yield is key for improving net incomes and to reduce machine fees and worker fees is crucial for decreasing fees.
基金National Key Technologies R&D Program(No.2006BAG04B01),research on technical standards,key structures and their characteristics of kilometer-magnitude cable-stayed bridges
文摘Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed.