This paper investigates the main scale analysis of the aerodynamic noise in the foremost bogie area by the large-eddy simulation(LES)and the Ffowcs Williams-Hawkings(FW-H)analogy.The mechanism of the aerodynamic noise...This paper investigates the main scale analysis of the aerodynamic noise in the foremost bogie area by the large-eddy simulation(LES)and the Ffowcs Williams-Hawkings(FW-H)analogy.The mechanism of the aerodynamic noise in this area has been excavated.The aerodynamic excitation results show that the bogie divides the bogie compartment into two cavities,each of which contains a large circulating flow and presents multi-peak characteristics in the frequency domain.The far-field noise results suggest that in the speed range of 200−350 km/h,the aerodynamic noise mechanism in the bogie area is the same.Cavity noise is the main noise mechanism in the foremost bogie area,and the bogie divides the bogie cabin into two cavities,thereby changing the aerodynamic noise in this area.展开更多
A simulation model was proposed to investigate the relationship between train delays and passenger delays and to predict the dynamic passenger distribution in a large-scale rail transit network. It was assumed that th...A simulation model was proposed to investigate the relationship between train delays and passenger delays and to predict the dynamic passenger distribution in a large-scale rail transit network. It was assumed that the time varying original-destination demand and passenger path choice probability were given. Passengers were assumed not to change their destinations and travel paths after delay occurs. CapaciW constraints of train and queue rules of alighting and boarding were taken into account. By using the time-driven simulation, the states of passengers, trains and other facilities in the network were updated every time step. The proposed methodology was also tested in a real network, for demonstration. The results reveal that short train delay does not necessarily result in passenger delays, while, on the contrary, some passengers may get benefits from the short delay. However, large initial train delay may result in not only knock-on train and passenger delays along the same line, but also the passenger delays across the entire rail transit network.展开更多
In this paper, we propose a new cellular automata model to simulate the railway traffic at station. Based on NaSch model, the proposed station model is composed of the main track and the siding track. Two different sc...In this paper, we propose a new cellular automata model to simulate the railway traffic at station. Based on NaSch model, the proposed station model is composed of the main track and the siding track. Two different schemes for trains passing through station are considered. One is the scheme of "pass by the main track, start and stop by the siding track". The other is the scheme of "two tracks play the same role". We simulate the train movement using the proposed model and analyze the traffic flow at station. The simulation results demonstrate that the proposed cellular automata model can be successfully used for the simulations of railway traffic. Some characteristic behaviors of railway traffic flow can be reproduced. Moreover, the simulation values of the minimum headway are close to the theoretical values. This result demonstrates the dependability and availability of the proposed model.展开更多
The interaction between the car-body vibration and aerodynamic performance of the train becomes more prominent motivated by the vehicle’s light-weighting design.To address this topic,this study firstly analyzes the p...The interaction between the car-body vibration and aerodynamic performance of the train becomes more prominent motivated by the vehicle’s light-weighting design.To address this topic,this study firstly analyzes the posture characteristics of the car-body based on the previous full-scale test results.And then the aerodynamic performance under different vibration cases(different car-body roll angles)is studied with an improved delayed detached eddy simulation(IDDES).The results revealed that car-body rolling had a significant impact on the aerodynamic behavior of bogies,which significantly increased the lateral force and yaw moment of a bogie and further may have aggravated the operational instability of the train.The unbalanced distribution of the longitudinal pressure on both sides of the bogie caused by the car-body rolling motion was the primary cause for the bogie yaw moment increase.The tail vortex of the train was also affected by the car-body rolling,resulting in vertical jitter.展开更多
In this paper, we propose an improved walk model for simulating the train movement on railway network. In the proposed method, walkers represent trains. The improved walk model is a kind of the network-based simulatio...In this paper, we propose an improved walk model for simulating the train movement on railway network. In the proposed method, walkers represent trains. The improved walk model is a kind of the network-based simulation analysis model. Using some management rules for walker movement, walker can dynamically determine its departure and arrival times at stations. In order to test the proposed method, we simulate the train movement on a part of railway network. The numerical simulation and analytical results demonstrate that the improved model is an effective tool for simulating the train movement on railway network. Moreover, it can well capture the characteristic behaviors of train scheduling in railway traffic.展开更多
Bridge-borne noise pollution caused by train-induced bridge vibration has attracted more and more attentions due to its low-frequency characteristic.In order to investigate the numerical simulation technique of bridge...Bridge-borne noise pollution caused by train-induced bridge vibration has attracted more and more attentions due to its low-frequency characteristic.In order to investigate the numerical simulation technique of bridge-borne noise and noise reduction methods,a simply supported prestressed concrete (PC) box-girder bridge is adopted for study.Based on train-track-bridge interaction theory,the dynamic response of the bridge under a moving high-speed train is calculated in time-domain and assumed as the sound source of bridge-borne noise.Then bridge-borne noise is estimated according to boundary element method (BEM) in frequency-domain.The time-frequency transform is conducted by fast Fourier transformation (FFT).The validity of the numerical simulation technique is verified through comparison with field measurement results.Furthermore,noise reduction methods are proposed and corresponding effects are discussed.Results show that the proposed numerical simulation method is feasible and accurate in assessing bridge-borne noise.The dominant frequencies of bridge vibration and bridgeborne noise range from 40 Hz to125 Hz and from 31.5 Hz to 100 Hz,respectively.The peak frequency of bridge-borne noise near the bottom plate is 63 Hz.Increasing the thickness of deck plate,adjusting the inclination of webs to 0°-12°,strengthening the boundary constraints and adding a longitudinal clapboard are very effective noise control measures.展开更多
基金Project(2017YFB1201103)supported by the National Key Research and Development Plan of ChinaProject(2019zzts540)supported by the Graduate Student Independent Innovation Project of Central South University,China。
文摘This paper investigates the main scale analysis of the aerodynamic noise in the foremost bogie area by the large-eddy simulation(LES)and the Ffowcs Williams-Hawkings(FW-H)analogy.The mechanism of the aerodynamic noise in this area has been excavated.The aerodynamic excitation results show that the bogie divides the bogie compartment into two cavities,each of which contains a large circulating flow and presents multi-peak characteristics in the frequency domain.The far-field noise results suggest that in the speed range of 200−350 km/h,the aerodynamic noise mechanism in the bogie area is the same.Cavity noise is the main noise mechanism in the foremost bogie area,and the bogie divides the bogie cabin into two cavities,thereby changing the aerodynamic noise in this area.
基金Project(51008229)supported by the National Natural Science Foundation of ChinaProject supported by Key Laboratory of Road and Traffic Engineering of Tongji University,China
文摘A simulation model was proposed to investigate the relationship between train delays and passenger delays and to predict the dynamic passenger distribution in a large-scale rail transit network. It was assumed that the time varying original-destination demand and passenger path choice probability were given. Passengers were assumed not to change their destinations and travel paths after delay occurs. CapaciW constraints of train and queue rules of alighting and boarding were taken into account. By using the time-driven simulation, the states of passengers, trains and other facilities in the network were updated every time step. The proposed methodology was also tested in a real network, for demonstration. The results reveal that short train delay does not necessarily result in passenger delays, while, on the contrary, some passengers may get benefits from the short delay. However, large initial train delay may result in not only knock-on train and passenger delays along the same line, but also the passenger delays across the entire rail transit network.
基金supported by National Natural Science Foundation of China under Grant Nos. 60634010 and 60776829Key Technology Research of Train Control System,and Urban Rail Transit Automation and Control Beijing Municipal Government Key Laboratory
文摘In this paper, we propose a new cellular automata model to simulate the railway traffic at station. Based on NaSch model, the proposed station model is composed of the main track and the siding track. Two different schemes for trains passing through station are considered. One is the scheme of "pass by the main track, start and stop by the siding track". The other is the scheme of "two tracks play the same role". We simulate the train movement using the proposed model and analyze the traffic flow at station. The simulation results demonstrate that the proposed cellular automata model can be successfully used for the simulations of railway traffic. Some characteristic behaviors of railway traffic flow can be reproduced. Moreover, the simulation values of the minimum headway are close to the theoretical values. This result demonstrates the dependability and availability of the proposed model.
基金Project(BX2021379)supported by the China National Postdoctoral Program for Innovative Talents。
文摘The interaction between the car-body vibration and aerodynamic performance of the train becomes more prominent motivated by the vehicle’s light-weighting design.To address this topic,this study firstly analyzes the posture characteristics of the car-body based on the previous full-scale test results.And then the aerodynamic performance under different vibration cases(different car-body roll angles)is studied with an improved delayed detached eddy simulation(IDDES).The results revealed that car-body rolling had a significant impact on the aerodynamic behavior of bogies,which significantly increased the lateral force and yaw moment of a bogie and further may have aggravated the operational instability of the train.The unbalanced distribution of the longitudinal pressure on both sides of the bogie caused by the car-body rolling motion was the primary cause for the bogie yaw moment increase.The tail vortex of the train was also affected by the car-body rolling,resulting in vertical jitter.
基金Supported by the National Natural Science Foundation of China under Grant Nos. 60634010 and 60776829New Century Excellent Talents in University under Grant No. NCET-06-0074
文摘In this paper, we propose an improved walk model for simulating the train movement on railway network. In the proposed method, walkers represent trains. The improved walk model is a kind of the network-based simulation analysis model. Using some management rules for walker movement, walker can dynamically determine its departure and arrival times at stations. In order to test the proposed method, we simulate the train movement on a part of railway network. The numerical simulation and analytical results demonstrate that the improved model is an effective tool for simulating the train movement on railway network. Moreover, it can well capture the characteristic behaviors of train scheduling in railway traffic.
基金supported by the National Natural Science Foundation of China (Grant Nos. 50678150,51008250)Program for New Century Excellent Talents in University of China (Grant No. NCET-10-0701)+1 种基金the National High Technology Research and Development Program of China("863" Program) (Grant No. 2011AA11A103)Specialized Research Fund for the Doctoral Program of Higher Education of China (Grant No.20110184110020)
文摘Bridge-borne noise pollution caused by train-induced bridge vibration has attracted more and more attentions due to its low-frequency characteristic.In order to investigate the numerical simulation technique of bridge-borne noise and noise reduction methods,a simply supported prestressed concrete (PC) box-girder bridge is adopted for study.Based on train-track-bridge interaction theory,the dynamic response of the bridge under a moving high-speed train is calculated in time-domain and assumed as the sound source of bridge-borne noise.Then bridge-borne noise is estimated according to boundary element method (BEM) in frequency-domain.The time-frequency transform is conducted by fast Fourier transformation (FFT).The validity of the numerical simulation technique is verified through comparison with field measurement results.Furthermore,noise reduction methods are proposed and corresponding effects are discussed.Results show that the proposed numerical simulation method is feasible and accurate in assessing bridge-borne noise.The dominant frequencies of bridge vibration and bridgeborne noise range from 40 Hz to125 Hz and from 31.5 Hz to 100 Hz,respectively.The peak frequency of bridge-borne noise near the bottom plate is 63 Hz.Increasing the thickness of deck plate,adjusting the inclination of webs to 0°-12°,strengthening the boundary constraints and adding a longitudinal clapboard are very effective noise control measures.