The objective of this work is to compare the responses of geosynthetically-reinforced embankment and unreinforced embankment due to road widening by using the centrifuge model tests and a two-dimensional(2D) finite el...The objective of this work is to compare the responses of geosynthetically-reinforced embankment and unreinforced embankment due to road widening by using the centrifuge model tests and a two-dimensional(2D) finite element(FE) model. The measured and calculated responses of the embankment and foundation exposed to road widening include the settlement,horizontal displacement,pore water pressure,and shear stresses. It is found that the road widening changed the transverse slope of the original pavement surface resulting from the nonuniform settlements. The maximum horizontal movement is found to be located at the shoulder of the original embankment. Although the difference is small,it is clearly seen that the geosynthetic reinforcement reduces the nonuniform settlements and horizontal movements due to road widening. Thus the reinforcement reduces the potential of pavement cracking and increases the stability of the embankment on soft ground in road widening.展开更多
This paper expatiated the field test of large diameter cast in place piles embedded in soft rock, including static loading test, high or low strain dynamic test, measurement of stresses and strains of pile body, and p...This paper expatiated the field test of large diameter cast in place piles embedded in soft rock, including static loading test, high or low strain dynamic test, measurement of stresses and strains of pile body, and pressure measurements between pile tip and soft rock. The relative in situ test problems are discussed. Based on the limit equilibrium theory and the load transfer equation, a synthesis method of analyzing the ultimate carrying capacity of single large diameter pile is put forward. The research results show that the key to determining the ultimate carrying capacity of single pile with a large diameter is the analysis of the intensity of soft rock.展开更多
As an advanced polymer composites electro-kinetic geosynthetics, the electro-osmotic vertical drainage(EVD) board could drain water quickly and accelerate consolidation process. However, the drainage rate was mainly i...As an advanced polymer composites electro-kinetic geosynthetics, the electro-osmotic vertical drainage(EVD) board could drain water quickly and accelerate consolidation process. However, the drainage rate was mainly impacted by the vertical drainage capability. Therefore, vertical drainage capability at the top of EVD board was theoretically analyzed. Basic requirements for drainage at the top of the board were summed up, as well as the formula of anode pore pressure when losing the vertical drainage capability. Meanwhile, a contrast test on the top and bottom drainage capacities was conducted. In use of the advanced EVD board, the voltage potential and pore pressure of anode were measured. Moreover, the derived formulas were verified. The result shows that the decrease of electric force gradient had an observable impact on the drainage capability. There was nearly no difference between the energy consumption for the two drainage methods. Although a little less water was discharged, the top drainage method had more advantages, such as high initial drainage velocity, few soil cracks, low anode water content and high soil strength. All of these show that the super soft soil ground could be consolidated quickly in use of the advanced EVD board through the top drainage. The top drainage method could efficiently improve the drainage effect, decrease the energy consumption and speed up the project proceeding.展开更多
CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the...CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance.展开更多
基金Project(200231800032) supported by Research on Transportation Construction in Western, China
文摘The objective of this work is to compare the responses of geosynthetically-reinforced embankment and unreinforced embankment due to road widening by using the centrifuge model tests and a two-dimensional(2D) finite element(FE) model. The measured and calculated responses of the embankment and foundation exposed to road widening include the settlement,horizontal displacement,pore water pressure,and shear stresses. It is found that the road widening changed the transverse slope of the original pavement surface resulting from the nonuniform settlements. The maximum horizontal movement is found to be located at the shoulder of the original embankment. Although the difference is small,it is clearly seen that the geosynthetic reinforcement reduces the nonuniform settlements and horizontal movements due to road widening. Thus the reinforcement reduces the potential of pavement cracking and increases the stability of the embankment on soft ground in road widening.
文摘This paper expatiated the field test of large diameter cast in place piles embedded in soft rock, including static loading test, high or low strain dynamic test, measurement of stresses and strains of pile body, and pressure measurements between pile tip and soft rock. The relative in situ test problems are discussed. Based on the limit equilibrium theory and the load transfer equation, a synthesis method of analyzing the ultimate carrying capacity of single large diameter pile is put forward. The research results show that the key to determining the ultimate carrying capacity of single pile with a large diameter is the analysis of the intensity of soft rock.
基金Project(B15020060)supported by Fundamental Research Funds for the Central Universities,China
文摘As an advanced polymer composites electro-kinetic geosynthetics, the electro-osmotic vertical drainage(EVD) board could drain water quickly and accelerate consolidation process. However, the drainage rate was mainly impacted by the vertical drainage capability. Therefore, vertical drainage capability at the top of EVD board was theoretically analyzed. Basic requirements for drainage at the top of the board were summed up, as well as the formula of anode pore pressure when losing the vertical drainage capability. Meanwhile, a contrast test on the top and bottom drainage capacities was conducted. In use of the advanced EVD board, the voltage potential and pore pressure of anode were measured. Moreover, the derived formulas were verified. The result shows that the decrease of electric force gradient had an observable impact on the drainage capability. There was nearly no difference between the energy consumption for the two drainage methods. Although a little less water was discharged, the top drainage method had more advantages, such as high initial drainage velocity, few soil cracks, low anode water content and high soil strength. All of these show that the super soft soil ground could be consolidated quickly in use of the advanced EVD board through the top drainage. The top drainage method could efficiently improve the drainage effect, decrease the energy consumption and speed up the project proceeding.
文摘CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance.