期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
酒钢CSP除盐泵站软水泵频繁启动问题的解决
1
作者 燕强 《甘肃冶金》 2010年第1期17-20,共4页
CSP除盐泵站担负着为酒钢CSP主线铸机提供生产设备所必须的软化水的任务,其软水泵能否正常工作,对主线生产意义重大。本文从软水泵的控制原理、存在的问题、解决问题的方案、实施效果、效益分析等几个方面对该问题的解决加以总结、推广。
关键词 软水泵 频繁启动问题 CSP除盐泵站
下载PDF
An innovative trigeneration system using biogas as renewable energy 被引量:1
2
作者 Grazia Leonzio 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2018年第5期1179-1191,共13页
One of the ways to decrease the global primary energy consumption and the corresponding greenhouse gas emissions is the application of the combined cooling, heating and power generation technologies, known as trigener... One of the ways to decrease the global primary energy consumption and the corresponding greenhouse gas emissions is the application of the combined cooling, heating and power generation technologies, known as trigeneration system. In this research an innovative trigeneration system, composed by an absorption heat pump, a mechanical compression heat pump, a steam plant, and a heat recovery plant is developed. The low tem- perature heat produced by absorption chiller is sent to a mechanical compression heat pump, that receives pro- cess water at low temperature from the heat recovery plant and bring it to higher temperatures. The trigeneration system is fed by biogas, a renewable energy. A design and a simulation of the system are developed by ChemCad 6.3 software. The plant produces 925 kW of electrical energy, 2523 kW of thermal energy and 473 kW of cooling energy, by the combustion of 3280 kW of biogas. Primary energy rate (P.E.R.) is equal 1.04 and a sensitivity analysis is carried out to evaluate the effect of cooling capacity, produced electrical energy and process water temperature. The first has a negative effect, while other parameters have a positive effect on P.E.R. Compared to a cogeneration system, the tdgeneration plant produces the 28% higher of power and the 40% lower of carbon dioxide emissions. An economic analysis shows that the plant is economically feasible only consid- ering economic incentives obtained by the use of heat pumps and steam plant at high efficiency. Saving 6431 t.a-1 corresponding to 658000 EUR.a-1 of incentives, the plant has a net present value (N.P.V.) and a pay back period (P.B.P.) respectively equal to 371000 EUR and 4 year. Future works should optimize the process considering cost and energetic efficiency as the two objective functions. 展开更多
关键词 Trigeneration system BIOGAS Energy efficiency Process simulation Heat pumps Environmental analysis
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部