期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
形状记忆合金管道连接件的连接性能研究
1
作者 谷凡 张媛媛 +1 位作者 宋景睿 刘力强 《建筑与预算》 2019年第3期38-43,共6页
本文采用试验与数值模拟相结合的技术路线,以Fe基形状记忆合金管道连接件为研究对象,探索了加热训练、配合间隙、连接件壁厚以及连接件长度等因素对形状记忆合金管道连接件连接性能的影响规律。研究结果表明:形状记忆合金管道连接件的... 本文采用试验与数值模拟相结合的技术路线,以Fe基形状记忆合金管道连接件为研究对象,探索了加热训练、配合间隙、连接件壁厚以及连接件长度等因素对形状记忆合金管道连接件连接性能的影响规律。研究结果表明:形状记忆合金管道连接件的壁厚、轴向长度对连接性能的影响呈现双折线形态;减少管道连接件和被连接钢管之间的配合间隙,或者增加管道连接件的加热训练次数,均可以提高管道连接件和被连接钢管之间的径向应力。在实际设计过程中,应综合考虑形状记忆合金管道连接件的连接性能与制造成本,同时考虑被连接钢管的承压能力以及装配难度等因素。 展开更多
关键词 形状记忆合金 管道连接件 连接性能 轴向拉拔试验 数值模拟
下载PDF
Parametric study on the axial performance of a fully grouted cable bolt with a new pull-out test 被引量:7
2
作者 Chen Jianhang Hagan Paul C. Saydam Serkan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期53-58,共6页
Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a wide range of cabl... Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a wide range of cable bolts,a new laboratory short encapsulation pull test(LSEPT) facility was developed. The facility simulates the interaction between cable bolts and surrounding rock mass,using artificial rock cylinders with a diameter of 300 mm in which the cable bolt is grouted. Furthermore,the joint where the load is applied is left unconstrained to allow shear slippage at the cable/grout or grout/rock interface.Based on this apparatus,a series of pull tests were undertaken using the MW9 modified bulb cable bolt.Various parameters including embedment length,test material strength and borehole size were evaluated. It was found that within a limited range of 360 mm,there is a linear relationship between the maximum bearing capacity of the cable bolt and embedment length. Beyond 360 mm,the peak capacity continues to rise but with a much lower slope. When the MW9 cable bolt was grouted in a weak test material,failure always took place along the grout/rock interface. Interestingly,increasing the borehole diameter from 42 to 52 m in weak test material altered the failure mode from grout/rock interface to cable/grout interface and improved the performance in terms of both peak and residual capacity. 展开更多
关键词 Modified cable boltsLoad transfer performanceShear slippageCable/grout interfaceEmbedment length
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部