This paper analyzes the level, characteristics and existing problems of current electricityprice in China. Under the present circumstances the overall orientation of power price reform inthe 10th Five-year Plan period...This paper analyzes the level, characteristics and existing problems of current electricityprice in China. Under the present circumstances the overall orientation of power price reform inthe 10th Five-year Plan period should satisfy the requirements of power industry restructuring.Therefore, it is necessary to set up an appropriate pricing mechanism and system including thelinks of sales price to network, transmission and distribution price (T&D price) and sales price.In the light of various factors influencing increase and decrease in price, a forecast of electricitytariff is given in the five years to come.[展开更多
The State Council issued the Scheme for Reforming Electricity Pricing System m the second half of year 2003. It touches upon separating price of plant from that of network, sales price to network, transmission and dis...The State Council issued the Scheme for Reforming Electricity Pricing System m the second half of year 2003. It touches upon separating price of plant from that of network, sales price to network, transmission and distribution price, sales price and system principles in regard to electricity tariff mainly.展开更多
The optimal transmission lines assignment with maximal reliabilities (OTLAMR) in the multi-source multi-sink multi-state computer network (MMMCN) was investigated. The OTLAMR problem contains two sub-problems: the MMM...The optimal transmission lines assignment with maximal reliabilities (OTLAMR) in the multi-source multi-sink multi-state computer network (MMMCN) was investigated. The OTLAMR problem contains two sub-problems: the MMMCN reliabilities evaluation and multi-objective transmission lines assignment optimization. First, a reliability evaluation with a transmission line assignment (RETLA) algorithm is proposed to calculate the MMMCN reliabilities under the cost constraint for a certain transmission lines configuration. Second, the non-dominated sorting genetic algorithm II (NSGA-II) is adopted to find the non-dominated set of the transmission lines assignments based on the reliabilities obtained from the RETLA algorithm. By combining the RETLA and the NSGA-II algorithms together, the RETLA-NSGA II algorithm is proposed to solve the OTLAMR problem. The experiments result show that the RETLA-NSGA II algorithm can provide efficient solutions in a reasonable time, from which the decision makers can choose the best solution based on their preferences and experiences.展开更多
Properties of the active power/angle sub-matrix in the power flow Jacobian for power system analysis are studied. The sub-matrix is a dominant and irreducible matrix under very general conditions of power systems, so ...Properties of the active power/angle sub-matrix in the power flow Jacobian for power system analysis are studied. The sub-matrix is a dominant and irreducible matrix under very general conditions of power systems, so that it is invertible. Also the necessary conditions for its singularity are given. These theoretical results can be used to clarify the ambiguous understanding of the sub-matrix in current literature, and also provide the theoretical foundations for the applications based on reduced power flow Jaeobian. Numerical simulation on the IEEE 118-bus power system is used to illustrate our results.展开更多
This paper presents a novel approach to find optimum locations and capacity of flexible alternating current transmission system (FACTS) devices in a power system using a multi-objective optimization function. Thyristo...This paper presents a novel approach to find optimum locations and capacity of flexible alternating current transmission system (FACTS) devices in a power system using a multi-objective optimization function. Thyristor controlled series compensators (TCSCs) and static var compensators (SVCs) are the utilized FACTS devices. Our objectives are active power loss reduction, newly introduced FACTS devices cost reduction, voltage deviation reduction, and increase on the robustness of the security margin against voltage collapse. The operational and controlling constraints, as well as load constraints, were considered in the optimum allocation. A goal attainment method based on the genetic algorithm (GA) was used to approach the global optimum. The estimated annual load profile was utilized in a sequential quadratic programming (SQP) optimization sub-problem to the optimum siting and sizing of FACTS devices. Fars Regional Electric Network was selected as a practical system to validate the performance and effectiveness of the proposed method. The entire investment of the FACTS devices was paid off and an additional 2.4% savings was made. The cost reduction of peak point power generation implies that power plant expansion can be postponed.展开更多
文摘This paper analyzes the level, characteristics and existing problems of current electricityprice in China. Under the present circumstances the overall orientation of power price reform inthe 10th Five-year Plan period should satisfy the requirements of power industry restructuring.Therefore, it is necessary to set up an appropriate pricing mechanism and system including thelinks of sales price to network, transmission and distribution price (T&D price) and sales price.In the light of various factors influencing increase and decrease in price, a forecast of electricitytariff is given in the five years to come.[
文摘The State Council issued the Scheme for Reforming Electricity Pricing System m the second half of year 2003. It touches upon separating price of plant from that of network, sales price to network, transmission and distribution price, sales price and system principles in regard to electricity tariff mainly.
基金Projects(61004074,61134001,21076179)supported by the National Natural Science Foundation of ChinaProject(2009BAG12A08)supported by the National Key Technology Support Program of China+1 种基金Project(2010QNA5001)supported by the Fundamental Research Funds for the Central Universities of ChinaProjects(2012AA06A404,2006AA04Z184)supported by the National High Technology Research and Development Program of China
文摘The optimal transmission lines assignment with maximal reliabilities (OTLAMR) in the multi-source multi-sink multi-state computer network (MMMCN) was investigated. The OTLAMR problem contains two sub-problems: the MMMCN reliabilities evaluation and multi-objective transmission lines assignment optimization. First, a reliability evaluation with a transmission line assignment (RETLA) algorithm is proposed to calculate the MMMCN reliabilities under the cost constraint for a certain transmission lines configuration. Second, the non-dominated sorting genetic algorithm II (NSGA-II) is adopted to find the non-dominated set of the transmission lines assignments based on the reliabilities obtained from the RETLA algorithm. By combining the RETLA and the NSGA-II algorithms together, the RETLA-NSGA II algorithm is proposed to solve the OTLAMR problem. The experiments result show that the RETLA-NSGA II algorithm can provide efficient solutions in a reasonable time, from which the decision makers can choose the best solution based on their preferences and experiences.
基金the National Natural Science Foundation of China (No. 50307007)
文摘Properties of the active power/angle sub-matrix in the power flow Jacobian for power system analysis are studied. The sub-matrix is a dominant and irreducible matrix under very general conditions of power systems, so that it is invertible. Also the necessary conditions for its singularity are given. These theoretical results can be used to clarify the ambiguous understanding of the sub-matrix in current literature, and also provide the theoretical foundations for the applications based on reduced power flow Jaeobian. Numerical simulation on the IEEE 118-bus power system is used to illustrate our results.
文摘This paper presents a novel approach to find optimum locations and capacity of flexible alternating current transmission system (FACTS) devices in a power system using a multi-objective optimization function. Thyristor controlled series compensators (TCSCs) and static var compensators (SVCs) are the utilized FACTS devices. Our objectives are active power loss reduction, newly introduced FACTS devices cost reduction, voltage deviation reduction, and increase on the robustness of the security margin against voltage collapse. The operational and controlling constraints, as well as load constraints, were considered in the optimum allocation. A goal attainment method based on the genetic algorithm (GA) was used to approach the global optimum. The estimated annual load profile was utilized in a sequential quadratic programming (SQP) optimization sub-problem to the optimum siting and sizing of FACTS devices. Fars Regional Electric Network was selected as a practical system to validate the performance and effectiveness of the proposed method. The entire investment of the FACTS devices was paid off and an additional 2.4% savings was made. The cost reduction of peak point power generation implies that power plant expansion can be postponed.