期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
徕卡第三代测量机器人在瓮福磷矿矿坑变形监测中的观测方法 被引量:4
1
作者 钟阳 刘富春 《测绘通报》 CSCD 北大核心 2014年第9期133-134,共2页
英坪2号坑采场是瓮福磷矿位于英坪矿段0-6线的一个大型露天磷矿采坑,在2号采场西翼形成了高达180 m的下盘顺层层面边坡,其中上半部边坡坡度平均为32°。通过徕卡TS30仪器对此边坡的多次观测结果进行分析与对比,研究与探讨边坡位移... 英坪2号坑采场是瓮福磷矿位于英坪矿段0-6线的一个大型露天磷矿采坑,在2号采场西翼形成了高达180 m的下盘顺层层面边坡,其中上半部边坡坡度平均为32°。通过徕卡TS30仪器对此边坡的多次观测结果进行分析与对比,研究与探讨边坡位移变化规律与外在因素影响的关系,并对原有设计方案提出建议。 展开更多
关键词 英坪2号坑采场 边坡观测分析 边坡方案设计
下载PDF
Dynamic Design and Construction of Highway Cut Slopes in Huangshan Area, China
2
作者 JU Nengpan ZHAO Jianjun +1 位作者 HUANG Runqiu DUAN Haipeng 《Journal of Mountain Science》 SCIE CSCD 2011年第2期154-165,共12页
Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined... Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved. 展开更多
关键词 Highway cut slopes Dynamic design and construction Excavation Permit Management System Slope stability
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部