期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Fault diagnosis of chemical processes based on partitioning PCA and variable reasoning strategy 被引量:4
1
作者 Guozhu Wang Jianchang Liu +1 位作者 Yuan Li Cheng Zhang 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2016年第7期869-880,共12页
Fault detection and identification are challenging tasks in chemical processes, the aim of which is to decide out of control samples and find fault sensors timely and effectively. This paper develops a partitioning pr... Fault detection and identification are challenging tasks in chemical processes, the aim of which is to decide out of control samples and find fault sensors timely and effectively. This paper develops a partitioning principal component analysis(PPCA) method for process monitoring. A variable reasoning strategy is proposed and applied to recognize multiple fault variables. Compared with traditional process monitoring methods, the PPCA strategy not only reflects the local behavior of process variation in each model(each direction of principal components),but also improves the monitoring performance through the combination of local monitoring results. Then, a variable reasoning strategy is introduced to locate fault variables. Unlike the contribution plot, this method locates normal and fault variables effectively, and gives initiatory judgment for ambiguous variables. Finally, the effectiveness of the proposed process monitoring and fault variable identification schemes is verified through a numerical example and TE chemical process. 展开更多
关键词 Fault detectionFault identificationProcess monitoringPartitioning PCAVariable reasoning strategy
下载PDF
关于电梯监督检验A类检验项目设置的商榷
2
作者 张立君 张众 +1 位作者 杨雷 王文彬 《中国电梯》 2015年第17期63-65,共3页
分析了我国现行TSGT7001-2009中电梯监督检验报告设置的A类检验项目设置特点。指出电梯安装。改造.重大维修实质性施工过程监督检验。均未设置质量控制A类检验项目,未能体现过程监检之意。建议在电梯监督检验项目中设置实质性施工过... 分析了我国现行TSGT7001-2009中电梯监督检验报告设置的A类检验项目设置特点。指出电梯安装。改造.重大维修实质性施工过程监督检验。均未设置质量控制A类检验项目,未能体现过程监检之意。建议在电梯监督检验项目中设置实质性施工过程的质量控制A类检验项目。 展开更多
关键词 电梯 监督检验 过程监检 A类检验项目 质量控制点
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部