项目准备阶段是PPP项目的第二阶段。基于对PPP投资项目的营利性、风险性和稳定预期等因素考量,社会资本尤其是民营资本对于PPP项目的投资持有很强的谨慎心理。从这个意义上来讲,做好PPP项目的准备工作,无论对政府还是社会资本方,或是PP...项目准备阶段是PPP项目的第二阶段。基于对PPP投资项目的营利性、风险性和稳定预期等因素考量,社会资本尤其是民营资本对于PPP项目的投资持有很强的谨慎心理。从这个意义上来讲,做好PPP项目的准备工作,无论对政府还是社会资本方,或是PPP项目的长远发展都是非常有必要的。项目准备阶段是P P P项目的第二阶段。基于对PPP投资项目的营利性、风险性和稳定预期等因素考量,社会资本尤其是民营资本对于P P P项目的投资持有很强的谨慎心理。从这个意义上来讲,做好PPP项目的准备工作,展开更多
In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give c...In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.展开更多
文摘项目准备阶段是PPP项目的第二阶段。基于对PPP投资项目的营利性、风险性和稳定预期等因素考量,社会资本尤其是民营资本对于PPP项目的投资持有很强的谨慎心理。从这个意义上来讲,做好PPP项目的准备工作,无论对政府还是社会资本方,或是PPP项目的长远发展都是非常有必要的。项目准备阶段是P P P项目的第二阶段。基于对PPP投资项目的营利性、风险性和稳定预期等因素考量,社会资本尤其是民营资本对于P P P项目的投资持有很强的谨慎心理。从这个意义上来讲,做好PPP项目的准备工作,
文摘In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.