期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
制作销售AI网络外挂软件行为的罪名适用探析
1
作者 梁家豪 《争议解决》 2024年第8期178-185,共8页
人工智能已经进入第三个发展阶段,AI与互联网、大数据和云计算技术的结合极大地提升了人工智能的计算能力和数据处理能力,推动了AI在各个领域的广泛应用。作为一种工具,其出现使得犯罪工具升级,这也导致了一些传统罪行的形态更加复杂,... 人工智能已经进入第三个发展阶段,AI与互联网、大数据和云计算技术的结合极大地提升了人工智能的计算能力和数据处理能力,推动了AI在各个领域的广泛应用。作为一种工具,其出现使得犯罪工具升级,这也导致了一些传统罪行的形态更加复杂,对社会的伤害程度增加。全国首例制作AI外挂犯罪被宣判,又是一种传统计算机犯罪通过与AI结合改变了运行逻辑,这一结合改变了传统外挂犯罪的行为方式,以及其所侵害的法益。因此,对制作新型AI类外挂犯罪是否可以适用与制作传统外挂类犯罪相同的罪名,即“提供侵入、非法控制计算机信息系统程序、工具罪”,需进一步讨论。对于此类新型AI类犯罪的定性,应通过研究其运行的技术机理来判断其法律性质,从而判处最精确的罪名。AI has entered its third stage of development. The combination of AI with the Internet, Big Data and cloud computing technology has greatly enhanced AI’s computing and data processing capabilities, it promotes the wide application of AI in various fields. As a kind of tool, its appearance makes the tool of crime upgrade, which also leads to the more complex pattern of some traditional crimes and the more harmful to the society. The first case of making AI plug-in crime in China was sentenced, and it is a traditional computer crime that changes the operation logic by combining with AI, which changes the behavior of traditional plug-in crime and the legal interests it infringes. Therefore, to make a new type of AI type of crime whether can be applied to make the same type of crime as the traditional type of crime, that is, “the provision of intrusion, illegal control of computer information system program and tools crime”, needs to be further discussed. To determine the nature of this new type of AI crime, we should judge its legal nature by studying its technical mechanism of operation, so as to sentence the most accurate crime. 展开更多
关键词 人工智能 制作外挂犯罪 运行技术机理 法律性质
下载PDF
The design and practice of giant hydro turbine generating units of Three Gorges Project
2
作者 Shao Jianxiong Liu Jingwang Yuan Dafu 《Engineering Sciences》 EI 2011年第3期88-95,共8页
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters... The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational. 展开更多
关键词 Three Gorges Project (TGP) 700 MW hydro-turbine generating unit unit capacity design and research operation stability practice
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部