进度、质量和成本三控结合在节水改造工程中的应用——以石羊河流域三干渠工程为例
1
作者 邱明玉 贾生海 《甘肃科技纵横》 2015年第9期65-66,112,共3页
针对石羊河流域用水矛盾突出,生态环境恶化,而该区域渠道工程具有战线长、工程量大、作业面宽、工序流程要求严密、土方工作量和渠道衬砌工程量大等特点,本文以灌区渠系节水改造工程《杂木灌区2009年度骨干工程改建工程三干渠(5+32... 针对石羊河流域用水矛盾突出,生态环境恶化,而该区域渠道工程具有战线长、工程量大、作业面宽、工序流程要求严密、土方工作量和渠道衬砌工程量大等特点,本文以灌区渠系节水改造工程《杂木灌区2009年度骨干工程改建工程三干渠(5+320~6+400)》为例,对石羊河流域渠道施工中的质量、进度、成本进行控制,总结了渠道施工“三控”经验。 展开更多
关键词 渠道施工 质量 进度:成本 控制
下载PDF
Present situation and improving measures of Chinese Construction Engineering Management informatization
2
作者 ZHOU Chuan 《International English Education Research》 2017年第4期73-74,共2页
Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering ma... Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering management model can not meet the needs of a large number of construction project information exchanges. Only realizing informationization of construction engineering management, can reduce the cost of construction projects, improve the efficiency of project management and construction progress. This paper analyzes the current situation of construction management informatization, and puts forward some suggestions to strengthen the construction management information construction. 展开更多
关键词 engineering management~ Information system~ Architectural Engineering
下载PDF
Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring 被引量:4
3
作者 Deng-hua ZHONG Wei HU +2 位作者 Bin-ping WU Zheng LI Jun ZHANG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2017年第1期1-19,共19页
Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or des... Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or design phase, built on static empirical data. However, due to its intrinsic uncertainties, rockfill dam construction is a dynamic process which requires the tradeoffto adjust dynamically to changes in construction conditions. In this study, a dynamic time-cost-quality tradeoff (DTCQT) method is proposed to balance time, cost, and quality at any stage of the construction process. A time-cost-quality tradeoff model is established that considers time cost and quality cost. Time, cost, and quality are dynamically estimated based on real-time monitoring. The analytic hierarchy process (AHP) method is applied to quantify the decision preferences among time, cost, and quality as objective weights. In addition, an improved non-dominated sorting genetic algorithm (NSGA-II) coupled with the technique for order preference by similarity to ideal solution (TOPSIS) method is used to search for the optimal compromise solution. A case study project is analyzed to demonstrate the applicability of the method, and the efficiency of the proposed optimization method is compared with that of the linear weighted sum (LWS) and NSGA-II. 展开更多
关键词 Dynamic time-cost-quality tradeoff Rockfill dam construction Real-time monitoring Decision preferences
原文传递