中山市中嘉水质净化厂进水站沉井设计方案 被引量:1
1
作者 黄力军 《山西建筑》 2006年第10期113-114,共2页
结合中山市中嘉水质净化厂进水站工程实例,对该进水站沉井设计方案的选型进行了介绍,对设计方案进行了计算研究,以使该设计方案更完善,可供类似工程借鉴。
关键词 进水站 沉井 设计 方案
下载PDF
进水过滤站在宁煤羊场湾矿的应用
2
作者 冯耀东 《煤矿机械》 北大核心 2012年第4期178-179,共2页
为保证煤矿井下工作面用水清洁,提高工作面支架液压系统的工作稳定性,按照"多级过滤体系"的理念,在煤矿井下引入了进水过滤站设备。经过1 a多的使用,井下液压元件的动作可靠性显著提高,液压元件损坏率大幅降低。该过滤站运行... 为保证煤矿井下工作面用水清洁,提高工作面支架液压系统的工作稳定性,按照"多级过滤体系"的理念,在煤矿井下引入了进水过滤站设备。经过1 a多的使用,井下液压元件的动作可靠性显著提高,液压元件损坏率大幅降低。该过滤站运行稳定、操作方便、过滤效果好,适合在煤矿井下工作面使用。 展开更多
关键词 清洁度 过滤 应用
下载PDF
High Slope Stability of Diversion Power System Intake of Jinchuan Hydropower Station 被引量:1
3
作者 TANG Liang-qin TANG Kui +2 位作者 NIE De-xin WANG Jun-jie LIU Dong-yan 《Journal of Mountain Science》 SCIE CSCD 2013年第6期1109-1117,共9页
The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization b... The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization become one of the most important geological engineering problems. At the same time, it is also crucial to select a safe and economic excavation gradient for the construction. We studied the problem of how to select a safe and economic slope ratio by analyzing the geological condition of the high slope, including the lithology, slope structure, structural surface and their combinations, rock weathering and unloading, hydrology, and the natural gradient. The study results showed that the use of an excavation gradient larger than the gradient observed during site investigation and the gradient recommended in standards and field practice manuals is feasible. Then, we used the finite element method and rigid limit equilibrium method to evaluate the stability of the excavation slope under natural, rainstorm and earthquake conditions. The calculated results showed that the excavated slope only has limited failure, but its stability is greatly satisfactory. The research findings can be useful in excavation and slope stabilization projects. 展开更多
关键词 Jinchuan Hydropower Station Highslope Excavation slope ratio STABILITY
下载PDF