期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
乌东德水电站大坝表孔施工关键技术
1
作者 商永红 《电力勘测设计》 2022年第3期67-72,共6页
乌东德水电站特高拱坝坝身布设5个表孔,跨横缝布置,是汛期重要的泄洪通道,其中底板、门槽及现浇大梁部位为表孔关键施工部位。依托乌东德水电站,研究特高拱坝表孔底板与侧墙整体浇筑、事故门槽一期安装与施工、连接大梁预留宽槽优化设... 乌东德水电站特高拱坝坝身布设5个表孔,跨横缝布置,是汛期重要的泄洪通道,其中底板、门槽及现浇大梁部位为表孔关键施工部位。依托乌东德水电站,研究特高拱坝表孔底板与侧墙整体浇筑、事故门槽一期安装与施工、连接大梁预留宽槽优化设计和预制梁封顶施工等技术,研发事故门槽自爬升台车,形成大坝表孔施工技术。通过工程应用,解决传统表孔施工技术存在的安全风险高、工期长等问题,为高拱坝快速、优质、安全施工提供技术保障。 展开更多
关键词 乌东德水电站 特高拱坝 表孔 事故门槽 连接大梁 施工技术
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
2
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua River Bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部