期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
连江大桥水中桩基施工技术 被引量:1
1
作者 许望成 《交通标准化》 2010年第10期99-101,共3页
水中桩基施工比较普遍,但因具体地质条件的不同,经常会遇到一些较难处理的问题。结合武广客运专线连江大桥水中桩基施工的实例,总结水中桩基施工的难点技术和易被忽略的技术细节,对保证隧道的安全、优质和高效完工具有一定的参考价值。
关键词 连江大桥 水中钻孔桩 沉碴厚度 施工技术
下载PDF
连江大桥水中桩基施工技术
2
作者 孔宝贵 《北方交通》 2010年第2期65-67,共3页
从水中桩基临建、材料运输、钻孔、清孔、下钢筋笼、混凝土灌注等方面谈了连江大桥水中桩基施工的一些经验。
关键词 连江大桥 水中桩基 施工技术
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
3
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua River Bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
4
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 Taizhou Yangtze River Highway Bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部