Two-lap sequential control converters are usually adopted to supply and improve the power factor of input side. The line harmonic damage generated by a sequential control thyristor converter can be serious. To solve t...Two-lap sequential control converters are usually adopted to supply and improve the power factor of input side. The line harmonic damage generated by a sequential control thyristor converter can be serious. To solve this prob-lem and seek an optimum control strategy,we derived the changeable regular of the line-input-current,the fundamen-tal-frequency-current,the harmonic-current-content and the harmonic total distortion ratio of the converter at different firing angles. We obtained relevant data from experiments with a sequential control system of a DC 2.2kW/220V motor. With the example of the operating condition of a DC mine elevator,the harmonic current is two times approximately in sequential control compared to synchronous control when the firing angle of the two converters differs in 30°. At dif-ferent operating states of a two-lap connection converter,the ideal strategy is an exchange between sequential control and synchronous control,by which we can achieve the complementary goal of improving the power factor and har-monic effect. All analytical conclusions are supported by simulation and experimental results.展开更多
Top structure and basement will confront the risk of being damaged on account of large stress and strain fields incurred by differential uplift and settlement between inner column and diaphragm wall in top-down method...Top structure and basement will confront the risk of being damaged on account of large stress and strain fields incurred by differential uplift and settlement between inner column and diaphragm wall in top-down method. Top-down excavation of the Metro Line 10 in Shanghai was modeled with finite element analysis software ABAQUS and parameters of subsoil were obtained by inverse analysis. Based on the finite element model and parameters, changes in the following factors were made to find more effective methods to restrain differential uplift and settlement: length of diaphragm wall, thickness of jet-grouting reinforcement layer, ways of subsoil reinforcement, sequence of pit excavation, connection between slabs and diaphragm wall or column and width of pit. Several significant results are acquired. The longer the diaphragm wall is, the greater the differential uplift between column and diaphragm wall is. Rigidity of roof slab is in general not strong enough to keep diaphragm wall and column undergoing the same uplift during excavation; Uplift at head of column and differential uplift between column and diaphragm wall decrease when subsoil from-16.6 to-43 m in pit is reinforced through jet-grouting. But, as excavation proceeds to a lower level, benefit from soil reinforcement diminishes. During the process applying vertical load, the larger the depth of diaphragm wall is, the smaller the settlement is at head of column and diaphragm wall, and the greater the differential settlement is between column and diaphragm wall. When friction connection is implemented between column, diaphragm wall and floor slabs, uplifts at head of column and diaphragm wall are larger than those of the case when tie connection is implemented, and so does differential uplift between column and diaphragm wall. The maximum deflection of diaphragm wall decreases by 58% on account of soil reinforcement in pit. The maximum deflection of diaphragm wall decreases by 61.2% when friction connection is implemented instead of tie connection.展开更多
基金Project GC06A523 supported by the Science and Technology Department of Heilongjiang Province
文摘Two-lap sequential control converters are usually adopted to supply and improve the power factor of input side. The line harmonic damage generated by a sequential control thyristor converter can be serious. To solve this prob-lem and seek an optimum control strategy,we derived the changeable regular of the line-input-current,the fundamen-tal-frequency-current,the harmonic-current-content and the harmonic total distortion ratio of the converter at different firing angles. We obtained relevant data from experiments with a sequential control system of a DC 2.2kW/220V motor. With the example of the operating condition of a DC mine elevator,the harmonic current is two times approximately in sequential control compared to synchronous control when the firing angle of the two converters differs in 30°. At dif-ferent operating states of a two-lap connection converter,the ideal strategy is an exchange between sequential control and synchronous control,by which we can achieve the complementary goal of improving the power factor and har-monic effect. All analytical conclusions are supported by simulation and experimental results.
基金Projects(51208071,51108312) supported by the National Natural Science Foundation of China
文摘Top structure and basement will confront the risk of being damaged on account of large stress and strain fields incurred by differential uplift and settlement between inner column and diaphragm wall in top-down method. Top-down excavation of the Metro Line 10 in Shanghai was modeled with finite element analysis software ABAQUS and parameters of subsoil were obtained by inverse analysis. Based on the finite element model and parameters, changes in the following factors were made to find more effective methods to restrain differential uplift and settlement: length of diaphragm wall, thickness of jet-grouting reinforcement layer, ways of subsoil reinforcement, sequence of pit excavation, connection between slabs and diaphragm wall or column and width of pit. Several significant results are acquired. The longer the diaphragm wall is, the greater the differential uplift between column and diaphragm wall is. Rigidity of roof slab is in general not strong enough to keep diaphragm wall and column undergoing the same uplift during excavation; Uplift at head of column and differential uplift between column and diaphragm wall decrease when subsoil from-16.6 to-43 m in pit is reinforced through jet-grouting. But, as excavation proceeds to a lower level, benefit from soil reinforcement diminishes. During the process applying vertical load, the larger the depth of diaphragm wall is, the smaller the settlement is at head of column and diaphragm wall, and the greater the differential settlement is between column and diaphragm wall. When friction connection is implemented between column, diaphragm wall and floor slabs, uplifts at head of column and diaphragm wall are larger than those of the case when tie connection is implemented, and so does differential uplift between column and diaphragm wall. The maximum deflection of diaphragm wall decreases by 58% on account of soil reinforcement in pit. The maximum deflection of diaphragm wall decreases by 61.2% when friction connection is implemented instead of tie connection.