An improved ant colony optimization (ACO) algorithm is utilized in cell scheduling of the flexible manufaturing process for considering the instrument constraint, manufacturing cost and time. Firstly, the initial we...An improved ant colony optimization (ACO) algorithm is utilized in cell scheduling of the flexible manufaturing process for considering the instrument constraint, manufacturing cost and time. Firstly, the initial weighted directional diagram is set up. Secondly, the algorithm based on the dynamic pheromone updating ensures the quick convergence and the optimal solution, thus improving the feasibility and the stability of the schedule system. Aiming at reducing collaboration with external partners, decreasing the total cost and balancing the production process, the algorithm is efficient in supporting the management process of the manufacturing cell and in strengthening the information arrangement capabitity of the scheduling system. Finally, experimental results of the improved algorithm are compared with those of other algorithms.展开更多
Based on predictions on Chinese power development in the coming 20 years, this paper introduces the emphases and key technologies in power sources and power network construction, and puts for ward the major tasks and ...Based on predictions on Chinese power development in the coming 20 years, this paper introduces the emphases and key technologies in power sources and power network construction, and puts for ward the major tasks and technological orientation for machinery manufacturers to supply qualified equipment to China power industry.展开更多
Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource ...Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource planning)and JIT(just-in-time)are researched properly following the comparison of MRP-Ⅱ and JIT and the analysis of shipbuilding production characteristics.A shipbuilding logistics system combining MRP-Ⅱ with JIT is set up and discussed according to a master production schedule(MPS),MRP and workshop-floor production control.The system is able to simplify the shipbuilding production plan,balance the workshop production,stabilize the supply,and inspire positivity and creativity so as to raise the shipbuilding production management level.展开更多
文摘An improved ant colony optimization (ACO) algorithm is utilized in cell scheduling of the flexible manufaturing process for considering the instrument constraint, manufacturing cost and time. Firstly, the initial weighted directional diagram is set up. Secondly, the algorithm based on the dynamic pheromone updating ensures the quick convergence and the optimal solution, thus improving the feasibility and the stability of the schedule system. Aiming at reducing collaboration with external partners, decreasing the total cost and balancing the production process, the algorithm is efficient in supporting the management process of the manufacturing cell and in strengthening the information arrangement capabitity of the scheduling system. Finally, experimental results of the improved algorithm are compared with those of other algorithms.
文摘Based on predictions on Chinese power development in the coming 20 years, this paper introduces the emphases and key technologies in power sources and power network construction, and puts for ward the major tasks and technological orientation for machinery manufacturers to supply qualified equipment to China power industry.
基金The National Key Technology R&D Program of China during the 11th Five-Year Plan Period(No.2006BAH02A06)
文摘Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource planning)and JIT(just-in-time)are researched properly following the comparison of MRP-Ⅱ and JIT and the analysis of shipbuilding production characteristics.A shipbuilding logistics system combining MRP-Ⅱ with JIT is set up and discussed according to a master production schedule(MPS),MRP and workshop-floor production control.The system is able to simplify the shipbuilding production plan,balance the workshop production,stabilize the supply,and inspire positivity and creativity so as to raise the shipbuilding production management level.