期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
德国、日本磁悬浮列车造型设计分析 被引量:5
1
作者 张瑞佛 李芳宇 《设计》 2018年第2期134-135,共2页
文章简要分析了日本和德国磁悬浮列车的设计发展概况;并基于德国TR系列磁悬浮列车和日本磁悬JRN公司系列磁悬浮列车分析了造型变化。通过对比分析两国磁悬浮列车历史造型设计,探究了影响列车造型变化的因素:速度因素、环境因素和美学因... 文章简要分析了日本和德国磁悬浮列车的设计发展概况;并基于德国TR系列磁悬浮列车和日本磁悬JRN公司系列磁悬浮列车分析了造型变化。通过对比分析两国磁悬浮列车历史造型设计,探究了影响列车造型变化的因素:速度因素、环境因素和美学因素。最后基于这些因素为我国磁悬浮列车系统设计提供有益参考。 展开更多
关键词 德国 日本 磁悬浮列车 造型设计分析
下载PDF
Research on the Fusion of Guangxi MiaoJin and Modern Arts and Crafts Design from the Perspectives of Aesthetic and Cultural Inheritance
2
作者 Ning Yun 《International Journal of Technology Management》 2015年第12期77-79,共3页
In this paper, we conduct research on the fusion of the Guangxi MiaoJin and modem arts and crafts design from the perspectives of aesthetic and the cultural inheritance. From angles of folk embroidery patterns modelli... In this paper, we conduct research on the fusion of the Guangxi MiaoJin and modem arts and crafts design from the perspectives of aesthetic and the cultural inheritance. From angles of folk embroidery patterns modelling characteristics are analyzed: include strong decorative and practical; the integrity of the vivid and concise; symbolic connotation deeply; simple random nature; handed down from generation to generation program. Discusses the forming characteristic of folk embroidery modelling is not an accidental phenomenon of art, but has a profound folk custom, economy, religion, and history of aesthetics, with typical regional culture characteristics. The research of folk embroidery in the status of folk art is of great significance. In the future, we will combine more literature review to optimize our current research and broaden the research boundary. 展开更多
关键词 Guangxi MiaoJin Arts and Crafts Aesthetic Perspective Cultural Inheritance DESIGN
下载PDF
RATIONAL CHOICE OF TECHNICAL REFORM SCHEMES OF MINE NO.1,PINGDINGSHAN MINING BUREAU
3
作者 韩可琪 王玉浚 张先尘 《Journal of China University of Mining and Technology》 1990年第1期31-41,共11页
Seven schemes for the developing extension, four schemes for the mining of the whole field and five schemes for the parameter are put forward in this paper to rational choice of technical reform schemes of Mine No.1. ... Seven schemes for the developing extension, four schemes for the mining of the whole field and five schemes for the parameter are put forward in this paper to rational choice of technical reform schemes of Mine No.1. Pingdingshan Mining Bureau.On the basis of conventional technical analysis, an optimum economy-mathmetical model of the developing preparatory schemes is worked out and a synthetic optimum is carried out. 展开更多
关键词 coal mine technical reform optimum model FEASIBILITY
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部