It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. ...It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. This paper outlines a new approach for prediction the overbreak depth during tunnel construction. Hence, firstly excavation damage zone(EDZ) are determined by average specific charge in each zone. Numerical modelling is used to simulate the EDZ around tunnel boundary and the overbreak depth are calculated by the rock strength factor. The predicted overbreak depth compared with observed field data from a case study. The results show that there exists an approximately up to 40% difference between the prediction and the observed volume of overbreak depth. Therefore, the method can be well used to predict the overbreak depth to estimate more precision of shotcrete and concrete volumes in tunnelling cost during design phase.展开更多
In order to study the distribution of lateral floor abutment pressure at a working face,we first used elasticity theory to establish a distribution model of lateral floor abutment pressure and then analysed its distri...In order to study the distribution of lateral floor abutment pressure at a working face,we first used elasticity theory to establish a distribution model of lateral floor abutment pressure and then analysed its distribution.Second,we established a three-dimensional numerical simulation model of the Haizi Coal Mine No.86 mining area by using FLAC^(3D)(ITASCA Consulting Group) software.We investigated the distribution of lateral floor abutment pressure of a stope,which indicated that the position of abutment pressure peak varies at different floor depths.We then determined the rational reinforcement range of a floor roadway,based on the conclusion reached earlier.Finally,we used our conclusions in support of the No.86 mining area crossing-roadway.The supported crossing-roadway remained stable when mining the upper workface,which validates the accuracy of our numerical simulation and provides a future reference for the support of span-roadways under similar conditions.展开更多
文摘It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. This paper outlines a new approach for prediction the overbreak depth during tunnel construction. Hence, firstly excavation damage zone(EDZ) are determined by average specific charge in each zone. Numerical modelling is used to simulate the EDZ around tunnel boundary and the overbreak depth are calculated by the rock strength factor. The predicted overbreak depth compared with observed field data from a case study. The results show that there exists an approximately up to 40% difference between the prediction and the observed volume of overbreak depth. Therefore, the method can be well used to predict the overbreak depth to estimate more precision of shotcrete and concrete volumes in tunnelling cost during design phase.
基金supported by the National Basic Research Program of China(No.2010CB226805)the National Natural Science Foundation of China(Nos.50874103 and 50974115)+1 种基金the Natural Science Foundation of Jiangsu Province(No.KB2008135)the State Key Laboratory Fund(No.SKLGDUEK0905)
文摘In order to study the distribution of lateral floor abutment pressure at a working face,we first used elasticity theory to establish a distribution model of lateral floor abutment pressure and then analysed its distribution.Second,we established a three-dimensional numerical simulation model of the Haizi Coal Mine No.86 mining area by using FLAC^(3D)(ITASCA Consulting Group) software.We investigated the distribution of lateral floor abutment pressure of a stope,which indicated that the position of abutment pressure peak varies at different floor depths.We then determined the rational reinforcement range of a floor roadway,based on the conclusion reached earlier.Finally,we used our conclusions in support of the No.86 mining area crossing-roadway.The supported crossing-roadway remained stable when mining the upper workface,which validates the accuracy of our numerical simulation and provides a future reference for the support of span-roadways under similar conditions.