A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput...A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput diagram model thus it is possible to describe the ship erection process numerically. Based on the digitalized models some cases of production balance of ship erection were studied and three balance indexes were put forward, they are the load balance rate, the input manpower balance rate and the maximum gantry crane operating times. Such an analytic method based on the balance evaluation is the important foundation for digitization and intelligentization of shipyard production management.展开更多
In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the di...In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.展开更多
In this paper, a modified multi-agent system for assembly line balancing is proposed. Each worker in the assembly line is regarded as an agent, and two neighboring agents exchange information about the allocated tasks...In this paper, a modified multi-agent system for assembly line balancing is proposed. Each worker in the assembly line is regarded as an agent, and two neighboring agents exchange information about the allocated tasks. To balance the workload, an agent with a smaller workload sends a request message to his/her neighboring agent, who has a larger workload, to exchange tasks between them. Without any centralized control mechanism, each agent behaves to achieve their goal, which is to balance the workload. A tabu list and cooling control are also incorporated. However, the effectiveness of the previous system is limited, and the system depends on problems to be solved. As such, a modified system is proposed. In the proposed system, the cycle time is used when considering the proposal of exchange of allocated tasks instead of the task time allocated to the neighboring workers. Also, in the proposed system, the length of tabu list is determined dynamically based on the current number of possible exchanges, and the best cycle time in the search with cooling at medium speed is recorded for the second search that is finished when the current cycle time reaches the recorded cycle time. The effectiveness of the modified system is investigated by solving problems for various conditions. The results show that the proposed system is effective regardless of the problems that are encountered.展开更多
基金the Key Scientific Research Project from MOE & MOF of China "Knowledge-based Ship-designHyper Integrated Platform (KSHIP)"
文摘A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput diagram model thus it is possible to describe the ship erection process numerically. Based on the digitalized models some cases of production balance of ship erection were studied and three balance indexes were put forward, they are the load balance rate, the input manpower balance rate and the maximum gantry crane operating times. Such an analytic method based on the balance evaluation is the important foundation for digitization and intelligentization of shipyard production management.
文摘In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.
文摘In this paper, a modified multi-agent system for assembly line balancing is proposed. Each worker in the assembly line is regarded as an agent, and two neighboring agents exchange information about the allocated tasks. To balance the workload, an agent with a smaller workload sends a request message to his/her neighboring agent, who has a larger workload, to exchange tasks between them. Without any centralized control mechanism, each agent behaves to achieve their goal, which is to balance the workload. A tabu list and cooling control are also incorporated. However, the effectiveness of the previous system is limited, and the system depends on problems to be solved. As such, a modified system is proposed. In the proposed system, the cycle time is used when considering the proposal of exchange of allocated tasks instead of the task time allocated to the neighboring workers. Also, in the proposed system, the length of tabu list is determined dynamically based on the current number of possible exchanges, and the best cycle time in the search with cooling at medium speed is recorded for the second search that is finished when the current cycle time reaches the recorded cycle time. The effectiveness of the modified system is investigated by solving problems for various conditions. The results show that the proposed system is effective regardless of the problems that are encountered.