期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
栓焊结构钢桥加劲梁的现场配钻孔施工方法
1
作者 郭平俊 《中国新技术新产品》 2014年第4期134-135,共2页
本文结合白鹤滩水电站三滩悬索钢桥加劲梁的现场制作,总结介绍了栓焊结构钢桥加劲梁的现场配钻孔施工方法。
关键词 加劲梁 配钻孔 钻孔模板 工艺
下载PDF
新疆哈密市沙尔湖铜金矿钻探施工工艺 被引量:1
2
作者 刘时焰 《世界有色金属》 2017年第17期258-259,共2页
主要从钻探工程设计、钻具配级、钻孔结构、钻进方法、护壁堵漏、孔斜预防等方面介绍了沙尔湖矿区钻探施工工艺以及经验。
关键词 钻孔 钻进方法 钻孔结构 护壁堵漏 孔斜预防
下载PDF
Borehole-GPR numerical simulation of full wave field based on convolutional perfect matched layer boundary 被引量:7
3
作者 朱自强 彭凌星 +1 位作者 鲁光银 密士文 《Journal of Central South University》 SCIE EI CAS 2013年第3期764-769,共6页
The absorbing boundary is the key in numerical simulation of borehole radar.Perfect match layer(PML) was chosen as the absorbing boundary in numerical simulation of GPR.But CPML(convolutional perfect match layer) appr... The absorbing boundary is the key in numerical simulation of borehole radar.Perfect match layer(PML) was chosen as the absorbing boundary in numerical simulation of GPR.But CPML(convolutional perfect match layer) approach that we have chosen has the advantage of being media independent.Beginning with the Maxwell equations in a two-dimensional structure,numerical formulas of finite-difference time-domain(FDTD) method with CPML boundary condition for transverse electric(TE) or transverse magnetic(TM) wave are presented in details.Also,there are three models for borehole-GPR simulation.By analyzing the simulation results,the features of targets in GPR are obtained,which can provide a better interpretation of real radar data.The results show that CPML is well suited for the simulation of borehole-GPR. 展开更多
关键词 borehole-GPR numerical simulation convolutional perfect match layer finite-difference time-domain method
下载PDF
Study of the location of testing area in residual stress measurement by Moiré interferometry combined with hole-drilling method 被引量:2
4
作者 QIN Le XIE HuiMin +3 位作者 ZHU RongHua WU Dan CHE ZhiGang ZOU ShiKun 《Science China(Physics,Mechanics & Astronomy)》 SCIE EI CAS 2014年第4期708-715,共8页
This paper investigates the effect of the location of testing area in residual stress measurement by Moiréinterferometry combined with hole-drilling method.The selection of the location of the testing area is ana... This paper investigates the effect of the location of testing area in residual stress measurement by Moiréinterferometry combined with hole-drilling method.The selection of the location of the testing area is analyzed from theory and experiment.In the theoretical study,the factors which affect the surface released radial strainεr were analyzed on the basis of the formulae of the hole-drilling method,and the relations between those factors andεr were established.By combining Moiréinterferometry with the hole-drilling method,the residual stress of interference-fit specimen was measured to verify the theoretical analysis.According to the analysis results,the testing area for minimizing the error of strain measurement is determined.Moreover,if the orientation of the maximum principal stress is known,the value of strain will be measured with higher precision by the Moiréinterferometry method. 展开更多
关键词 hole-drilling residual stress Moiré interferometry testing area
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部