To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev...To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable.展开更多
Gateways at faces of great mining heights are mostly driven along the roof of coal seams.For gateway height restrictions,a 1-3 m floor coal is retained,leaving a triangular floor coal at the face ends,causing a loss o...Gateways at faces of great mining heights are mostly driven along the roof of coal seams.For gateway height restrictions,a 1-3 m floor coal is retained,leaving a triangular floor coal at the face ends,causing a loss of coal.In order to improve coal recovery rates and to ensure efficiency of equipment at coal mining faces,we investigated suitable retention methods and recovery technology of floor coal at face ends.The upper floor coal can directly be recovered by a shearer with floor dinting.The lower floor coal is recovered by shearer with floor dinting after advanced floor dinting and retaining a step for protecting coal sides in a haulage gateway.Field practice shows that this method can improve the coal recovery rates at fully mechanized working faces with great mining heights.展开更多
The stability control of longwall coalface is the key technology of large-cutting-height mining method.Therefore,a systematic study of the factors that affect coalface stability and its control technology is required ...The stability control of longwall coalface is the key technology of large-cutting-height mining method.Therefore,a systematic study of the factors that affect coalface stability and its control technology is required in the development of large-cutting-height mining method in China. After the practical field observation and years of study,it was found that the more than 95% of failures in coalface are shear failure. The shear failure analysis model of coalface has been established,that can perform systematic study among factors such as mining height,coal mass strength,roof load,support resistance,and face flipper protecting plate horizontal force. Meanwhile,sensitivity analysis of factors influencing coalface stability showed that improving support capacity,cohesion of coal mass and decreasing roof load of coalface are the key to improve coalface stability. Numerical simulation of the factors affecting coalface stability has been performed using UDEC software and the results are consistent with the theoretical analysis. The coalface reinforcement technology of large-cutting-height mining method using the grouting combined with coir rope is presented. Laboratory tests have been carried out to verify its reinforcement effect and practical application has been implemented in several coal mines with good results.It has now become the main technology to reduce longwall coalface failure of large-cutting-height mining method.展开更多
基金the National Basic Research Program of China (No.2014CB046905)Innovation Project for Graduates in Jiangsu Province (No.KYLX15_1405)+1 种基金the National Natural Science Foundation of China (Nos.51274191 and 51404245)the Doctoral Fund of Ministry of Education of China (No.20130095110018)
文摘To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable.
基金the Independent Research of the State Key Laboratory of Coal Resources and Mine Safety(No. SKLCRSM09X02)the Open Research Fund of the State Key Laboratory of Coal Resources and Mine Safety(No.08KF12)the Graduate Students of Jiangsu Province Innovation Program Funded Projects(No.CX09B_120Z) for their financial support
文摘Gateways at faces of great mining heights are mostly driven along the roof of coal seams.For gateway height restrictions,a 1-3 m floor coal is retained,leaving a triangular floor coal at the face ends,causing a loss of coal.In order to improve coal recovery rates and to ensure efficiency of equipment at coal mining faces,we investigated suitable retention methods and recovery technology of floor coal at face ends.The upper floor coal can directly be recovered by a shearer with floor dinting.The lower floor coal is recovered by shearer with floor dinting after advanced floor dinting and retaining a step for protecting coal sides in a haulage gateway.Field practice shows that this method can improve the coal recovery rates at fully mechanized working faces with great mining heights.
基金financial support from National Basic Research Program of China (No.2013CB227903)the National Natural Science Foundation of General Program of China (No.51574244)the Joint Funds of the National Natural Science Foundation of China (No.U1361209) are greatly appreciated
文摘The stability control of longwall coalface is the key technology of large-cutting-height mining method.Therefore,a systematic study of the factors that affect coalface stability and its control technology is required in the development of large-cutting-height mining method in China. After the practical field observation and years of study,it was found that the more than 95% of failures in coalface are shear failure. The shear failure analysis model of coalface has been established,that can perform systematic study among factors such as mining height,coal mass strength,roof load,support resistance,and face flipper protecting plate horizontal force. Meanwhile,sensitivity analysis of factors influencing coalface stability showed that improving support capacity,cohesion of coal mass and decreasing roof load of coalface are the key to improve coalface stability. Numerical simulation of the factors affecting coalface stability has been performed using UDEC software and the results are consistent with the theoretical analysis. The coalface reinforcement technology of large-cutting-height mining method using the grouting combined with coir rope is presented. Laboratory tests have been carried out to verify its reinforcement effect and practical application has been implemented in several coal mines with good results.It has now become the main technology to reduce longwall coalface failure of large-cutting-height mining method.