期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
郝家河铜矿深部技改工程关键问题的分析与对策
1
作者 周朝云 《采矿技术》 2012年第2期15-16,共2页
就郝家河铜矿深部技改工程建设中的关键问题进行详细分析,并提出相关建议及解决问题的具体措施,以期对提高项目建设速度有所帮助。
关键词 采矿技术改造 关键问题 对策 郝家河铜矿
下载PDF
RATIONAL CHOICE OF TECHNICAL REFORM SCHEMES OF MINE NO.1,PINGDINGSHAN MINING BUREAU
2
作者 韩可琪 王玉浚 张先尘 《Journal of China University of Mining and Technology》 1990年第1期31-41,共11页
Seven schemes for the developing extension, four schemes for the mining of the whole field and five schemes for the parameter are put forward in this paper to rational choice of technical reform schemes of Mine No.1. ... Seven schemes for the developing extension, four schemes for the mining of the whole field and five schemes for the parameter are put forward in this paper to rational choice of technical reform schemes of Mine No.1. Pingdingshan Mining Bureau.On the basis of conventional technical analysis, an optimum economy-mathmetical model of the developing preparatory schemes is worked out and a synthetic optimum is carried out. 展开更多
关键词 coal mine technical reform optimum model FEASIBILITY
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部