期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
湖南桃江锰矿采矿材料消耗年度定额计算方法初探
1
作者 李小明 《中国锰业》 1999年第3期19-21,共3页
通过对湖南桃江锰矿多年统计资料的分析,结合凿岩爆破特点,从计划管理角度提出采矿消耗年度定额计算方法,经验证,与实际吻合较好,对该矿采矿降耗具有一定的指导意义。
关键词 采矿材料 计算方法 消耗定额
下载PDF
企业“材料成本差异”的帐务处理 被引量:1
2
作者 张裕辉 《中国乡镇企业会计》 1996年第2期41-41,共1页
企业“材料成本差异”的帐务处理张裕辉"材料成本差异"是个资产类会计科目,它是与"材料"类有关科目性质相同、记帐方向相同的一般会计科目。"材料"类科目的记帐方向是材料入库时.借记材料;材料发出时,贷记材料,其余额在借方... 企业“材料成本差异”的帐务处理张裕辉"材料成本差异"是个资产类会计科目,它是与"材料"类有关科目性质相同、记帐方向相同的一般会计科目。"材料"类科目的记帐方向是材料入库时.借记材料;材料发出时,贷记材料,其余额在借方,为材料库存数。根据这个道理,在多... 展开更多
关键词 材料成本差异 实际价格 负差额 记帐方法 江苏省启东市 会计科目 帐务处理 计划价格 采矿材料 材料采购
下载PDF
Using particle swarm optimization algorithm in an artificial neural network to forecast the strength of paste filling material 被引量:24
3
作者 CHANG Qing-liang ZHOU Hua-qiang HOU Chao-jiong 《Journal of China University of Mining and Technology》 EI 2008年第4期551-555,共5页
In order to forecast the strength of filling material exactly, the main factors affecting the strength of filling material are analyzed. The model of predicting the strength of filling material was established by appl... In order to forecast the strength of filling material exactly, the main factors affecting the strength of filling material are analyzed. The model of predicting the strength of filling material was established by applying the theory of artificial neural net- works. Based on cases related to our test data of filling material, the predicted results of the model and measured values are com- pared and analyzed. The results show that the model is feasible and scientifically justified to predict the strength of filling material, which provides a new method for forecasting the strength of filling material for paste filling in coal mines. 展开更多
关键词 mining engineering paste filling material neural network particle swarm optimized algorithm prediction
下载PDF
Similar material simulation of time series system for induced caving of roof in continuous mining under backfill 被引量:9
4
作者 高峰 周科平 +1 位作者 董卫军 苏家红 《Journal of Central South University of Technology》 EI 2008年第3期356-360,共5页
With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similari... With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similarity theory,a two-dimensional similar simulation test-bed was constructed. The stress and displacement that change along with the advance of mining were acquired and analyzed automatically by data system. The processes of continuous mining of ore-block in 5 intervals and artificial induced caving of roof were simulated. The results of the test show that ore body remained as safety roof in thickness of 15 m guarantees the safe advance of stoping work face. Caving of safety roof puts in practice at the first two mining intervals when the third interval of continuous mining is finished,and one interval as the safety distance should be kept all the time between stopping and caving. While mining in the last interval,pre-slotting should be implemented first of all,and the roof of the last two mining intervals is caved simultaneously. Only this kind of time series system can be an efficient and safe way for induced caving of roof in continuous mining. 展开更多
关键词 continuous mining induced caving similar material simulation safety roof SLOTTING
下载PDF
Application of fuzzy logic for determining of coal mine mechanization
5
作者 HOSSEINI S AA ATAEI M +1 位作者 HOSSEINI S M AKHYANI M 《Journal of Coal Science & Engineering(China)》 2012年第3期225-231,共7页
The fundamental task of mining engineers is to produce more coal at a given level of labour input and material costs, for optimum quality and maximum efficiency. To achieve these goals, it is necessary to automate and... The fundamental task of mining engineers is to produce more coal at a given level of labour input and material costs, for optimum quality and maximum efficiency. To achieve these goals, it is necessary to automate and mechanize mining operations. Mechanization is an objective that can result in significant cost reduction and higher levels of profitability for underground mines. To analyze the potential of mechanization, some important factors such as seam inclination and thickness, geological disturbances, seam floor conditions and roof conditions should be considered. In this study we have used fuzzy logic, membership functions and created fuzzy rule-based methods and considered the ultimate objective: mechanization of mining. As a case study, the mechanization of the Tazare coal seams in Shahroud area of Iran was investigated. The results show a low potential for mechanization in most of the Tazare coal seams. 展开更多
关键词 fuzzy logic MECHANIZATION coal seams PRODUCTIVITY fuzzytech software
下载PDF
Calculation method of first collapse span with superhigh water material backfill mining 被引量:3
6
作者 ZHANG Li-ya DENG Ka-zhong 《Journal of Coal Science & Engineering(China)》 2012年第4期374-378,共5页
It is critical for the material to be of active supporting capacity before initial collapse ot mare root wltn supermgn water material backfill mining, and the maximum bending moment should be first calculated in order... It is critical for the material to be of active supporting capacity before initial collapse ot mare root wltn supermgn water material backfill mining, and the maximum bending moment should be first calculated in order to determine the initial collapse span. In the light of principal of virtual work, the simple expression of deflection, bending moment of elastic clamped plate were deduced under the condition of vertical uniform distributed load, horizontal pressure and supporting by elastic foundation, and then, the maximal bending moment expression was derived too. At the same time, the influence degree on square clamped plate by adding horizontal pressure and elastic foundation were analyzed. The results show that the effect of horizontal pressure on maximal bending moment can be ignored when the value of horizontal pressure is two orders of magni- tude less than that of coeificient of elastic stiffness existing elastic foundation. 展开更多
关键词 first collapse span superhigh water material backfill mining elastic clamped plate principal of virtual work
下载PDF
Large clusters of gold deposits and large-scale metallogenesis in the Jiaodong Peninsula, Eastern China 被引量:46
7
作者 翟明国 杨进辉 刘文军 《Science China Earth Sciences》 SCIE EI CAS 2001年第8期758-768,共11页
The Jiaodong Peninsula is the largest repository of gold in China based on the production in history. It covers less than 0.2% of China's territory, but production of gold accounts for about one fourth of the whol... The Jiaodong Peninsula is the largest repository of gold in China based on the production in history. It covers less than 0.2% of China's territory, but production of gold accounts for about one fourth of the whole country. Thus, the Jiaodong Peninsula is a typical area or case of large-scale metallogenesis and a large clusters of mineral deposits in China. It is characterized by the large clusters of gold deposits in large scale, high reserve and short mineralizing stage. In this study, we suggest that the eastern boundary of the large clusters of gold deposits is as same as that of North China Block, the gold deposits are hosted by Archean metamorphic rocks or Mesozoic granites, and the age of gold mineralization is 121.6 to 122.7 Ma. Gold and related ore-forming materials are derived from multisources, i.e. Archean metamorphic rocks, granites and intermediate-mafic dikes, especially, intermediate-mafic dikes and calc-alkaline granites. The metallogenic geodynamic process is constrained by the tectonic evolution of eastern North China Block during Late Mesozoic, and it is the result of the interaction between mantle and crust as the boundary plates are playing role on the block. 展开更多
关键词 boundary of the large clusters of gold deposits in the Jiaodong Peninsula age of gold mineralization source of ore-forming materials tectonic setting
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部