Based on the open stope method,the stability of the gob area was decided bypillars and stiff roof.Therefore,it was dispensable to leave pillars with long-term strengthand enough size to support the stiff roof during m...Based on the open stope method,the stability of the gob area was decided bypillars and stiff roof.Therefore,it was dispensable to leave pillars with long-term strengthand enough size to support the stiff roof during mining activities.Based on the miningconditions of Baixiang wollastonite mine in Changxing County of Zhejiang,while consideringpillars with different shape,irregular size,and distribution,the load imposed on the pillarswas analyzed,and the safety coefficient was calculated in order to determine theirsupport status.The strength of stiff roof was calculated by means of analytical solution-theory of rectangle thin plate rested on elastic foundation.The system stability ofpillar and stiff roof was analyzed according to the proportion of the total cross section areaof pillars to the stiff roof area above the mined area.展开更多
Based on the analysis of the basic characteristics for the gob site in Northern Shaanxi Province and the room and pillar mining way about coal mine, the variety rule of the coal beds below the site was studied by the ...Based on the analysis of the basic characteristics for the gob site in Northern Shaanxi Province and the room and pillar mining way about coal mine, the variety rule of the coal beds below the site was studied by the using of FEM during the process of coal mining. The statuses of the stresses and strains and the varieties of the plastic area were simulated in the whole rock and coal pillars. The characters of stresses and deformation of the gob area of the coalmine were analyzed and evaluated after the site built in weathering. Moreover, the long-term stability of the gob area was predicted. As a result, the deformation of the gob area under the site is not been finished, and there is the danger that the gob site will collapsing as a whole; therefore, relative measures must be taken.展开更多
文摘Based on the open stope method,the stability of the gob area was decided bypillars and stiff roof.Therefore,it was dispensable to leave pillars with long-term strengthand enough size to support the stiff roof during mining activities.Based on the miningconditions of Baixiang wollastonite mine in Changxing County of Zhejiang,while consideringpillars with different shape,irregular size,and distribution,the load imposed on the pillarswas analyzed,and the safety coefficient was calculated in order to determine theirsupport status.The strength of stiff roof was calculated by means of analytical solution-theory of rectangle thin plate rested on elastic foundation.The system stability ofpillar and stiff roof was analyzed according to the proportion of the total cross section areaof pillars to the stiff roof area above the mined area.
文摘Based on the analysis of the basic characteristics for the gob site in Northern Shaanxi Province and the room and pillar mining way about coal mine, the variety rule of the coal beds below the site was studied by the using of FEM during the process of coal mining. The statuses of the stresses and strains and the varieties of the plastic area were simulated in the whole rock and coal pillars. The characters of stresses and deformation of the gob area of the coalmine were analyzed and evaluated after the site built in weathering. Moreover, the long-term stability of the gob area was predicted. As a result, the deformation of the gob area under the site is not been finished, and there is the danger that the gob site will collapsing as a whole; therefore, relative measures must be taken.