期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Research on Optimization of Component Stock
1
作者 王海霞 汤文成 钟秉林 《Journal of Southeast University(English Edition)》 EI CAS 1999年第1期101-105,共5页
A set of model is established to optimize BSW Company’s component stock. By analyzing the company’s current part stock condition in terms of the occupation of capitals in the precondition of continuous production, i... A set of model is established to optimize BSW Company’s component stock. By analyzing the company’s current part stock condition in terms of the occupation of capitals in the precondition of continuous production, it describes how to control the purchase parameters of import parts. The model describes how to adjust slightly product output sequence and how to control the components’ purchase parameters: purchasing risk time and purchase order quantity. Then simulation is developed to illustrate the model. 展开更多
关键词 stock control purchase time fence purchasing risk time safety stock quantity economic order quantity
下载PDF
Evaluating an Overseas Supplier
2
作者 Christodoulos Nikou Socrates J. Moschuris 《Journal of Mathematics and System Science》 2013年第8期395-408,共14页
"Besides an evaluation of an overseas supplier by using normal methods, some enterprises start their collaboration with him by assigning a small trial order and if supplier's performance is considered to be satisfac... "Besides an evaluation of an overseas supplier by using normal methods, some enterprises start their collaboration with him by assigning a small trial order and if supplier's performance is considered to be satisfactory then a full order capable of sufficing all the appeared demand comes from the enterprise"[50]. This could be one of the practices followed by an organization/company that procures Military Critical Items-MCIs, items with a major impact to the safety and the accomplishment of a mission. In our conceptual approach, we will try to propose a tool for a quick and simple supplier selection under the method mentioned above. Furthermore, in almost every procurement scenario, major critical success factors for supplier selection, such as Quality and Delivery, considered also as military criteria [46], play an extremely important role [5]. Based on this, we argue that final decision for the approved supplier could be based on what we call Coefficient of Total Trial Performance-CTTP, constituted by the following factors: P&G Perfect Order concept of each trial order [50], Prediction Intervals/Confidence Intervals for achieved delivery times as a statistical estimator of future delivery times, A suggested factor, called the Management Trial Score-MTS. 展开更多
关键词 Military critical items confidence interval business intelligence perfect order quality.
下载PDF
美国UTC提起诉讼质疑钛材来源
3
作者 姚文静 《中国钛业》 2014年第4期43-44,共2页
近日,美国A&P Alloys及其所有人John J.Palie Jr.被美国联合技术公司(UTC)指控“错误描述”钛材来源。这批钛材用于UTC子公司普拉特惠特尼(P&W)生产的美国军事飞机发动机。UTC称,A&P Alloys为满足P&W严格的要求,错误地... 近日,美国A&P Alloys及其所有人John J.Palie Jr.被美国联合技术公司(UTC)指控“错误描述”钛材来源。这批钛材用于UTC子公司普拉特惠特尼(P&W)生产的美国军事飞机发动机。UTC称,A&P Alloys为满足P&W严格的要求,错误地描述了其钛材的来源和质量。据称,A&P Alloys将俄罗斯生产的钛材提供给P&W的发动机项目。通常情况下,俄罗斯生产的钛材禁止用于美国军用飞机。 展开更多
关键词 钛材 UTC 惠特尼 提起诉讼 飞机发动机 普拉特 零部件供应商 诉讼财产保全 洛克希德马丁 采购订
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部