Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway s...Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway supporting of workface 103 under three types of roof conditions with different supporting technologies and parameters were carried out based on the theory of supporting technology of gob-side entry. The results show the supporting of gob-side entry retaining is successful, and the deep surrounding rock is effectively controlled by field monitoring and drilling-hole photos. After stress in surrounding rock of roadways restores stable, the final roadway deformation of surrounding rock of haulage roadway and air-roadway are both about 300 mm; width of gob-side entry is 3.8-4.0 m and average height is 2.0-2.2 m; roadway section is above 8.0 m^2, which solves the problems of gob-side entry retaining support strength and safe mining; necessary conditions of mining safety in workface 103 are met.展开更多
文摘Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway supporting of workface 103 under three types of roof conditions with different supporting technologies and parameters were carried out based on the theory of supporting technology of gob-side entry. The results show the supporting of gob-side entry retaining is successful, and the deep surrounding rock is effectively controlled by field monitoring and drilling-hole photos. After stress in surrounding rock of roadways restores stable, the final roadway deformation of surrounding rock of haulage roadway and air-roadway are both about 300 mm; width of gob-side entry is 3.8-4.0 m and average height is 2.0-2.2 m; roadway section is above 8.0 m^2, which solves the problems of gob-side entry retaining support strength and safe mining; necessary conditions of mining safety in workface 103 are met.