In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamb...In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamber was conducted. Based on mathematical description of optimal arrangement for pressure measurement points,fuzzy clustering analysis and discriminant analysis were used to divide pressure regions of nodes on bulkhead. Finally,the selection method of optimal measurement points was proposed,and by selecting d6.28 m EPBS as study object,the case study was conducted. By contrast,based on optimal arrangement scheme of pressure measurement points,through adopting weighted algorithm,the absolute error mean of equivalent pressure of working chamber is the smallest. In addition,pressure curve of optimal arrangement points presents parabola,and it can show the state of pressure distribution on bulkhead truly. It is concluded that the optimal arrangement method of pressure measurement points in working chamber is effective and feasible,and the method can provide basis for realizing high precision pressure control of EPBS.展开更多
The site drilling packer permeability test and TEM to the 2100 workface in Gucheng coalmine determined the two-zone height under sublevel strip mining.The conclusion considers that the lying strata deterioration law o...The site drilling packer permeability test and TEM to the 2100 workface in Gucheng coalmine determined the two-zone height under sublevel strip mining.The conclusion considers that the lying strata deterioration law of the strip mining is similar to that of the sublevel mining.Thus, against that the actually measured data lacked, it is feasible to refer to the reservation of the waterproof coal pillar in the neighbor coalmine under sublevel situation.However, it is necessary to further launch the research on lying strata deterioration law under sublevel striping mining for the purpose of providing the right foundation for the layout of the workface not mined so far and the reservation of the waterproof coal pillar in the mining area.展开更多
基金Project(2007CB714006) supported by the National Basic Research Program of China
文摘In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamber was conducted. Based on mathematical description of optimal arrangement for pressure measurement points,fuzzy clustering analysis and discriminant analysis were used to divide pressure regions of nodes on bulkhead. Finally,the selection method of optimal measurement points was proposed,and by selecting d6.28 m EPBS as study object,the case study was conducted. By contrast,based on optimal arrangement scheme of pressure measurement points,through adopting weighted algorithm,the absolute error mean of equivalent pressure of working chamber is the smallest. In addition,pressure curve of optimal arrangement points presents parabola,and it can show the state of pressure distribution on bulkhead truly. It is concluded that the optimal arrangement method of pressure measurement points in working chamber is effective and feasible,and the method can provide basis for realizing high precision pressure control of EPBS.
基金Supported by Fujian Administration of Education for Science Research (JB08232)the State Key Development Program for Basic Research of China(2006CB202200)
文摘The site drilling packer permeability test and TEM to the 2100 workface in Gucheng coalmine determined the two-zone height under sublevel strip mining.The conclusion considers that the lying strata deterioration law of the strip mining is similar to that of the sublevel mining.Thus, against that the actually measured data lacked, it is feasible to refer to the reservation of the waterproof coal pillar in the neighbor coalmine under sublevel situation.However, it is necessary to further launch the research on lying strata deterioration law under sublevel striping mining for the purpose of providing the right foundation for the layout of the workface not mined so far and the reservation of the waterproof coal pillar in the mining area.