矿山地理信息系统(Mine Geographic Information System,MGIS),是实现矿山信息化的最重要的工具之一,是实现数字矿山的重要载体,而矿山信息管理数据库正是此载体的核心。矿山信息具有复杂性、海量性、异质性、不确定性和动态性及多源、...矿山地理信息系统(Mine Geographic Information System,MGIS),是实现矿山信息化的最重要的工具之一,是实现数字矿山的重要载体,而矿山信息管理数据库正是此载体的核心。矿山信息具有复杂性、海量性、异质性、不确定性和动态性及多源、多精度、多时相和多尺度特征。利用地理信息系统的开发思想与工具,结合金属矿山实际项目,依托数据库设计理论与方法,详细分析并构建了基于金属矿山的生产数据库,完成了金属矿山地理信息系统生产信息管理部分模块功能的构建。展开更多
In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of produc...In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of production, safety and environmental impact in the underground metal mine was established by using multidisciplinary design optimization method. The coupling effects from various disciplines were fully considered, and adaptive mutative scale chaos immunization optimization algorithm was adopted to solve multidisciplinary design optimization model of underground metal mine production scale. Practical results show that multidisciplinary design optimization on production scale of an underground lead and zinc mine reflect the actual operating conditions more realistically, the production scale is about 1.25 Mt/a (Lead and zinc metal content of 160 000 t/a), the economic life is approximately 14 a, corresponding coefficient of production profits can be increased to 15.13%, safety factor can be increased to 5.4% and environmental impact coefficient can be reduced by 9.52%.展开更多
The enlarged production scale of underground non-ferrous metal mines is affected by many uncertain factors difficult to describe mathematically with any level of accuracy.The problem can be solved by a synthesis of ar...The enlarged production scale of underground non-ferrous metal mines is affected by many uncertain factors difficult to describe mathematically with any level of accuracy.The problem can be solved by a synthesis of artificial intelligence.Based on the analysis of the major factors affecting the scale of enlarged production,we first interpreted in detail the design principles and structure of the intelligent system.Secondly,we introduced an ANN subsystem.In order to ensure technological and scale efficien- cies of the training samples for ANN,we filtrated the samples with a DEA method.Finally,we trained the intelligent system,which was proved to be very efficient.展开更多
Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimiza...Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimization methods that are not capable of accounting for inherent technical uncertainties such as uncertainty in the expected ore/metal supply from the underground, acknowledged to be the most critical factor. To integrate ore/metal uncertainty into the optimization of mine production scheduling a stochastic integer programming(SIP) formulation is tested at a copper deposit. The stochastic solution maximizes the economic value of a project and minimizes deviations from production targets in the presence of ore/metal uncertainty. Unlike the conventional approach, the SIP model accounts and manages risk in ore supply, leading to a mine production schedule with a 29% higher net present value than the schedule obtained from the conventional, industry-standard optimization approach, thus contributing to improving the management and sustainable utilization of mineral resources.展开更多
文摘矿山地理信息系统(Mine Geographic Information System,MGIS),是实现矿山信息化的最重要的工具之一,是实现数字矿山的重要载体,而矿山信息管理数据库正是此载体的核心。矿山信息具有复杂性、海量性、异质性、不确定性和动态性及多源、多精度、多时相和多尺度特征。利用地理信息系统的开发思想与工具,结合金属矿山实际项目,依托数据库设计理论与方法,详细分析并构建了基于金属矿山的生产数据库,完成了金属矿山地理信息系统生产信息管理部分模块功能的构建。
基金Project(2012BAK09B02-05) supported by the National "Twelfth Five-year" Science & Technology Support Plan of China
文摘In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of production, safety and environmental impact in the underground metal mine was established by using multidisciplinary design optimization method. The coupling effects from various disciplines were fully considered, and adaptive mutative scale chaos immunization optimization algorithm was adopted to solve multidisciplinary design optimization model of underground metal mine production scale. Practical results show that multidisciplinary design optimization on production scale of an underground lead and zinc mine reflect the actual operating conditions more realistically, the production scale is about 1.25 Mt/a (Lead and zinc metal content of 160 000 t/a), the economic life is approximately 14 a, corresponding coefficient of production profits can be increased to 15.13%, safety factor can be increased to 5.4% and environmental impact coefficient can be reduced by 9.52%.
基金Project 50374005 supported by the National Natural Science Foundation of China
文摘The enlarged production scale of underground non-ferrous metal mines is affected by many uncertain factors difficult to describe mathematically with any level of accuracy.The problem can be solved by a synthesis of artificial intelligence.Based on the analysis of the major factors affecting the scale of enlarged production,we first interpreted in detail the design principles and structure of the intelligent system.Secondly,we introduced an ANN subsystem.In order to ensure technological and scale efficien- cies of the training samples for ANN,we filtrated the samples with a DEA method.Finally,we trained the intelligent system,which was proved to be very efficient.
基金funded from the National Science and Engineering Research Council of Canada,Collaborative R&D Grant CRDPJ 335696 with BHP Billiton and NSERC Discovery Grant 239019 to R. Dimitrakopoulos
文摘Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimization methods that are not capable of accounting for inherent technical uncertainties such as uncertainty in the expected ore/metal supply from the underground, acknowledged to be the most critical factor. To integrate ore/metal uncertainty into the optimization of mine production scheduling a stochastic integer programming(SIP) formulation is tested at a copper deposit. The stochastic solution maximizes the economic value of a project and minimizes deviations from production targets in the presence of ore/metal uncertainty. Unlike the conventional approach, the SIP model accounts and manages risk in ore supply, leading to a mine production schedule with a 29% higher net present value than the schedule obtained from the conventional, industry-standard optimization approach, thus contributing to improving the management and sustainable utilization of mineral resources.