Based on blasting demolition of high thin-wall hyperbolic reinforced concrete cool tower, by virtue of engineering practice of blasting the tube concrete structures, the analysis and research were made on the mechanis...Based on blasting demolition of high thin-wall hyperbolic reinforced concrete cool tower, by virtue of engineering practice of blasting the tube concrete structures, the analysis and research were made on the mechanism of cool tower collapse through selecting blasting parameters and selecting gap form, gap size and gap angle. The cool tower was twisted, collapsed directionally and broken well according to the design requirements. The expected results and purposes of blasting were obtained with no back blow, total blasted pile approximates to 4 - 5 m, no occurrence of flying stones and no damage to fixed buildings and equipment, the large-sized hyperbolic thin-wall reinforced concrete cool towers are twisted during blasting and it collapses well with good breaking. The test and measurement of blasting vibrating velocity was carried out during blasting and the measuring results are much less than critical values specified by Safety Regulations for Blasting. The study shows that gap form, gap size and gap angle are the key factors to cool tower collapse and will give beneficial references to related theoretical study and field application.展开更多
In order to build a power plant with high efficiency,low investment and zero warm water discharge,a series of innovations are applied to the two 1 000-MW units of Ninghai Power Plant.The new technologies include the c...In order to build a power plant with high efficiency,low investment and zero warm water discharge,a series of innovations are applied to the two 1 000-MW units of Ninghai Power Plant.The new technologies include the closed-circuit system for seawater cooling tower with a spraying area of 13 000 m2,the main buildings with reinforced concrete structure,the plasma ignition system for tower boiler and the fieldbus control system.Optimization measures are taken in some aspects,such as the open point of the turbine overload valves,the boiler dimensions,the technical process,the electric system,the building structures and the layout of the power plant.The units have been running for more than half a year with the thermal efficiency as high as 45.79% and without warm water discharged,which indicates that all the systems are safe and steady and the original purpose of optimization has been realized.展开更多
文摘Based on blasting demolition of high thin-wall hyperbolic reinforced concrete cool tower, by virtue of engineering practice of blasting the tube concrete structures, the analysis and research were made on the mechanism of cool tower collapse through selecting blasting parameters and selecting gap form, gap size and gap angle. The cool tower was twisted, collapsed directionally and broken well according to the design requirements. The expected results and purposes of blasting were obtained with no back blow, total blasted pile approximates to 4 - 5 m, no occurrence of flying stones and no damage to fixed buildings and equipment, the large-sized hyperbolic thin-wall reinforced concrete cool towers are twisted during blasting and it collapses well with good breaking. The test and measurement of blasting vibrating velocity was carried out during blasting and the measuring results are much less than critical values specified by Safety Regulations for Blasting. The study shows that gap form, gap size and gap angle are the key factors to cool tower collapse and will give beneficial references to related theoretical study and field application.
文摘In order to build a power plant with high efficiency,low investment and zero warm water discharge,a series of innovations are applied to the two 1 000-MW units of Ninghai Power Plant.The new technologies include the closed-circuit system for seawater cooling tower with a spraying area of 13 000 m2,the main buildings with reinforced concrete structure,the plasma ignition system for tower boiler and the fieldbus control system.Optimization measures are taken in some aspects,such as the open point of the turbine overload valves,the boiler dimensions,the technical process,the electric system,the building structures and the layout of the power plant.The units have been running for more than half a year with the thermal efficiency as high as 45.79% and without warm water discharged,which indicates that all the systems are safe and steady and the original purpose of optimization has been realized.