“混凝土把杆梁”吊装大跨度钢梁的技术研究
1
作者 李力寻 《中文科技期刊数据库(全文版)工程技术》 2023年第6期134-137,共4页
钢筋混凝土梁指的是使用钢筋与混凝土材料制作的梁,这种梁可以作为独立梁,还能和钢筋混凝土板构成整体的梁板式楼盖,是房屋桥梁工程建设的重要承重构件。将混凝土构件制作成把杆梁的结构形式,将其用在存在地下室空间的建筑中,完成大跨... 钢筋混凝土梁指的是使用钢筋与混凝土材料制作的梁,这种梁可以作为独立梁,还能和钢筋混凝土板构成整体的梁板式楼盖,是房屋桥梁工程建设的重要承重构件。将混凝土构件制作成把杆梁的结构形式,将其用在存在地下室空间的建筑中,完成大跨度钢梁吊装施工作业。根据工程实际概况,把握钢梁吊装施工难点,通过合理的吊装与吊具选择,科学搭设临时钢平台,完成对主钢梁的安装施工和滑移吊装,严格依据钢梁吊装安全操作要点实现“混凝土把杆梁”的钢梁吊装施工,以期为相关工程提供借鉴与参考。 展开更多
关键词 “混凝土把杆梁” 大跨度钢梁 钢梁吊装施工 钢梁固定
下载PDF
Geometric state transfer method for construction control of a large-segment steel box girder with hoisting installation 被引量:6
2
作者 Jin-feng WANG Hua-wei XIANG +2 位作者 Jiang-tao ZHANG Tian-mei WU Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第5期382-391,共10页
This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a ... This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a large-segment steel box girder are determined, such as the manufacturing parameters of the top and bottom slabs, the width of the annular joint, and the support position. Second, the geometric state equations and state transfer matrixes of large-segment steel box girders under different conditions are deduced by taking the mileage and elevation of control points as basic state variables. In application of the geometric state transfer method in the construction control of the Hong Kong-Zhuhai-Macao Bridge, the width of the annular joint and the position parameters for the support of the large-segment steel box girder are predicted precisely. Moreover, the manufacturing parameters of the top and bottom slabs of the steel box girders are calculated reliably. The measured values show that the width of the annular joint is basically the same with the difference of less than 2 mm, the eccentricity of bridge support is less than 20 mm, and the elevation error of the bridge deck is within-10 mm to +15 mm, which meets the construction accuracy. Using the geometric state transfer method, the rapid and accurate installation of the Hong Kong-Zhuhai-Macao Bridge has been realized, demonstrating that the precise control of the geometric state of a steel box girder with ectopic installation and multi-state transition can be realized by using the geometric state transfer method. 展开更多
关键词 Large-segment steel box girder Offshore hoisting Construction control Geometric state Transfer matrix
原文传递